Demand Response Program demands 50 kW reduction

NC-v4 EAc4:Demand response
posted by  Edgar Arevalo  on 

I have a project in New York CIty where the local utility provides a demand response program where the building would participate in peak load reduction for 4 consecutive hours on a day where the u

3
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Mon Oct 5, 2020, 6:22 pm

Adding Kitchens in the Minimum IAQ Performance Calculator

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Edgar Arevalo  on 

There is no clear selection for kitchens in the occupancy category of the calculator, and yet when I took a look at the IEQ matrix it shows Kitchen spaces are to be included for IEQp1.  N

3
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Sat Oct 3, 2020, 7:56 pm

Partially Naturally Conditioned Spaces

Schools-2009 IEQc7.1:Thermal Comfort—Design
posted by  Kelly Beisswanger  on 

I'm trying to figure out how to pursue this credit when I have classrooms, a gymnasium, and cafeteria that are only heated with no mechanical cooling.

0

Residential or nonresidential?

CS-v4 LTc4:Surrounding density and diverse uses
posted by  Patricia Brezny  on 

How are these classified for calculating surrounding density? Dormitories? Hotels?

3
LEED Services Director
Group14 Engineering, Inc.
LEEDuser Premium Member
47 thumbs up
Wed Sep 30, 2020, 7:44 pm

Which buildings need to be modeled?

ND-Plan-v4 GIBp2:Minimum building energy performance
posted by  Tim Nabholz  on 

Hi All,

The following is noted in the reference guide after Option 2:

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Sep 30, 2020, 5:55 pm

What counts in terms of "conditioned space"?

Healthcare-v4 SSc7:Places of respite
posted by  Garrett Ferguson  on 

What types of conditioned spaces count towards places of respite? I'm assuming break rooms, waiting rooms, and sim? 

0

Extraction distance to factory and distance from factory to construction site.

NC-2009 MRc5:Regional Materials
posted by  cedric grenier  on 

Hi, I'm having a little bit of trouble understanding exactly what distance they're asking for. It may sound like a bad question but it's an itch I need to scratch.

0

FAR of a retail unit within a Multi-Use Building

ND-Plan-v4 NPDc2:Compact development
posted by  Tim Nabholz  on 

Is there another way to count the FAR of retail in multi-storey building with residential above?

1
Mon Sep 28, 2020, 11:27 pm
11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 25, 2020, 9:55 pm