Forum quick links
Equity Plan examples?
CS-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Casey Cullen-Woods on
Hello, I am working on a Core and Shell Office Building that does not mee tthe v4 pathway for this credit.
Lighting coordination with Thermal Comfort
NC-v4 EQc6:Interior lightingposted by Laura strauss on
- Are Janitors Rooms, Storage Rooms, Electrical Rooms, Mechanical Rooms, Elevator Rooms, (not normally occupied rooms) required to conform with controls if listed in the thermal comfort submit
Life Cycle Assessment all or none points
NC-v4 MRc1:Building life-cycle impact reductionposted by Katie Vasbinder on
for the Life Cycle Assessment is it all 3 points or none? so you cannot get 1 or 2?
Public transit reductions due to COVID
NC-v4 LTc5:Access to quality transitposted by Erin Holdenried on
During the COVID pandemic, there has been a reduction in frequency of public transportation. Are projects permited to use pre-pandemic rates when calculating number of trips, as the rate
unobstructed views, floating ceilings, window effective head height
CI-v4.1 EQc8:Quality Viewsposted by Kristen Magnuson on
Hello LEED Community,
Option 2 Examples?
NC-v4.1 MRc4:Material Ingredientsposted by SIG - Sustainability Main Account on
We are looking for examples for Option 2 for:
- Material Ingredient Screening and Optimization
- Advanced Inventory & Assessment (HPD or Manufacturer Inventory)
EAc5 Points
NC-2009 EAc5:Measurement and Verificationposted by Jeannie Rueter on
Just trying to understand how the points are awarded for this credit. Option 3 is worth 1 point. Either option 1 or 2 are worth 3 points?
Is PV Watts acceptable documentation?
NC-v4 EAc5:Renewable energy productionposted by Erin Holdenried on
Is PV Watts calculator acceptable documentation for this credit? The specific PV panels for our project will not be selected until construction, so we won't have a more specific calculation o
Exterior lighting - Residential roof
NC-v4 EAp2:Minimum energy performanceposted by Camilo Velez on
Hello all,
we're working on a mixed-use building under LEED NC v4, which has in its last floor a residential space with exclusive access to an open roof terrace.