Forum quick links
Concrete in ROOF - SRI
NC-v4 SSc5:Heat island reductionposted by Victoria Rios Esteve on
Hi everyone!
Building Footprint in mixed used building
NC-2009 PIf2:Project Summary Detailsposted by Victoria Rios Esteve on
Hi everyone,
Soils in green roofs
NC-v4.1 SSc2:Protect or Restore Habitatposted by Alexia Anastassiadis on
Hi! Our project has a FAR of 8 (zero lot line, 9 floors) and all open space is located in different green roofs that account for 40% of incorporated vegetated space.
Solar Panels
NC-2009 EAc2:On-Site Renewable Energyposted by Paula Hernandez on
Hello, I am working on a Project that wants to claim all the available points on EA-c2.
Naturally Ventilated Warehouse
CS-v4 EQp1:Minimum indoor air quality performanceposted by Micaela Smulevich on
We are currently working on incorporating sufficient strategies to naturally ventilate an industrial warehouse.
Need more info on v4.1 Integrative Process credit
NC-v4.1 IPc1:Integrative Processposted by Victoria Rios Esteve on
Hi everyone! We are working on the certificacion of a major renovation building. We are willing to get this IP credit but have some doubts.
Aerator with no WaterSense label
NC-v4 WEp2:Indoor water use reductionposted by Victoria Rios Esteve on
Hi everyone,
Minisplit Efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hi
I am certifiying an office building, a very small one, attached to a wharehouse.
Minisplit Efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hi
I am certifiying an office building, a very small one, attached to a wharehouse.