NC-v4 EAc7:Green power and carbon offsetsposted by Vitor Tosetto on
Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.
Carbon Dioxide Monitors
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by sebastian castañeda on
I currently have installed co2 sensors in densely occupied rooms located to the specifications mentioned in the OM LEED V4 Ref Guide.
EBOM Project Occupancy Doubt
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Marina Andrade on
Hi everyone, I’m working on a project and I have a doubt about occupancy in the EBOM. After the measurements, we found that the air conditioning system does not meet the external ventilation lev
100% On site Infiltration
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Rodrigo Tonda on
Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).
Withered grass
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Gustavo De las Heras Izquierdo on
Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.
VRF system
NC-2009 EAp3:Fundamental refrigerant managementposted by GISELA FARHAT DE ARAUJO on
We are using the vrf system on a project. Should i put as type of equipment Split AC or should i chose the "others" option?
Speech Privacy on HC
Healthcare-v2009 IEQc2:Acoustic environmentposted by Saymon Grauppe on
Hello. There's another doubt now about Speech Privacy accoeding items 4.4 and 4.5 guide 2010 FGI, where comments Enclosed Rooms and Open-plan spaces. So, for Enclose Rooms what situations are appl
Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
Deadline for Appeal
posted by Marcio Alberto Casado Pereira on
Hi Folks, We received the final decisiona on a very complicated industrial building we are pursuing certification for and EAp2 and IEQp1 were denied.
Core & Shell Retrofit
CS-v4 SSc1: Site assessmentposted by Juliana Malho on
I'm wondering if the credit is achievable by retrofit projects.