Oriented Strand Board - OSB
CI-2009 MRc6:Rapidly Renewable Materialsposted by Lorenna Lobo on
Hi, is the oriented strand board - osb considered as rapidly renewable?
Multiple Building HVAC system
posted by Paula Hernandez on
Hello, We have two buildings in the same Project boundary, as far as I understand, this would be a Group Building Certification. The HVAC system will be variuous VRF systems, each for each floor of
LEED v3 2009 certification in 2018
posted by Vanessa Montezuma Ramos on
Hi everyone, I just started the certification of a laboratory building on LEED v3 2009.
Non Local Supplier
CS-2009 MRc6:Certified Woodposted by Jose Antonio Kovacevic on
Hi, We have a non local supplier.
Lighting Power Density requirement for Tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Pedro Urazan on
Hi, Is it required that the Tenants comply in their lighting designs with the Lighting Power Density requirement of ASHRAE 90.1 2007?
Dist. Center - Light polution
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Antonio Macedo Filho on
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?
Window-sill
NC-v4 EQc8:Quality viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
a one-family House can be LEED EBOM?
EBOM-2009 PIf2:Project Summary Detailsposted by Alan Viale on
Hi, we have a house for one-family with the interest to be a LEED EBOM. is this possible? all the credits which require measurement, verification, or following can be responsible of the family o
n/a
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).