Forum quick links
Construction Phases
Hospitality-NC-v4 MPR1:Must be in a permanent location on existing landposted by Larissa Murakami on
We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.
IEQp1 - calculator
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by sebastian castañeda on
My greetings I am working through In the IEQp1 Minimum Indoor air quality performance and I need orientation with respect to systems with natural ventilation. I need to know if exists a calculator
Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello,
I am modeling a winery and some of the chillers participate only to chilled and heat wine tanks.
Natural Ventilation Procedure - Prescriptive Path 62.1 2010
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
materials not used in the original construction are verified in the re-evaluation of the certification?
posted by ANDREZA PASSOS on
I would like to know if Unused Materials, when purchased by the company along with the LEED guidelines, can cause owners to lose certification during the renewal evaluation of the certificate?
Consumption of hotel guests in common areas
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Gabriela Mesquita on
We have a Hotel Project in Paraguay. We have sent the Project documentation and the reviewers have made an observation regarding the Water Use Reduction Calculation.
Vegetated roofs for Places of Respite Credit
Healthcare-v4 SSc7:Places of respiteposted by María Fernanda Aguirre on
Hello everyone: There is a huge hospital in Chile which is in design phase and wants to pursue LEED.
Fresh air needs in server rooms for data center
Data-Centers-NC-v4 EQp1:Minimum indoor air quality performanceposted by Jose Antonio Kovacevic on
Hello,
In order to assess compliance of a Data Center with prerrequisite EQp1 and credit EQc1, I would like to know how we should calculate fresh air needs for the server rooms.
Polyvalent Chiller Efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Francisca Herrera on
Hi, I hope you can help me with my query.
In a project in process of certification LEED v2009, we are evaluating the efficiency of a polyvalent chiller.