Forum quick links
Multi Scene Control for Lighting
NC-v4 EAp2:Minimum energy performanceposted by Gabriela Crespo on
Dear all, We're working on a LEED v4 NC project in Mexico.
Zero Lot Line Deveoped Site
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Guillermo Hernandez Espinoza on
Hi everyone.
Exhaust not interlocked with HVAC
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello, we have this residential project were the HVAC system is as follows:
Baseline: System 2 - PTHP
Proposed: Mini Split System
Prerequisites Submitted under Campus
posted by Guillermo Hernandez Espinoza on
Hi everyone, I was wondering, since some of the prerequisites are Campus Eligible, does that means I don't have to submitted those prerequisites if earned for the LEED projects inside the campus ?
Retail Terrace
EBOM-v4 SSc4:Light pollution reductionposted by Jorge Lopez de Obeso on
Hello everyone, We are working on a project attempting option 2: Perimeter measurements.
LT Prerequisite: Transportation performance
posted by Gaston Michaud on
Hello everyone!
Scope of credit
CS-v4 EQc3:Construction indoor air quality management planposted by ilse angel on
During construction there is an stage when the contractor is building the slabs and columns of the levels above the ground floor.