Sensors calibration during the performace period

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Agnieszka Rylska  on 

Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet?

1
Thu Dec 10, 2015, 3:18 pm

access to medical point and massage point

NC-2009 IDc1:Innovation in Design
posted by  Agnieszka Rylska  on 

We are considering options for innovation credits.

0

renovation of multiple non-contiguous parts of an office

CI-2009 MPR2:Must be a complete, permanent building or space
posted by  Agnieszka Rylska  on 

The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.

0

Baseline Garage Ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is:

0

LEED EBOM

Pilot-Credits EQpc78:Design for active occupants
posted by  Lukas Urban  on 

Hi! Can we use this Pilot-Credit in a LEED EBOM project? Our staircase meets almost all the conditions. Thank you.

0

VRP Compliance Calculator

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, Regarding VRP Compliance Calculator (IEQp1), there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several

1
Fri Nov 13, 2015, 8:02 pm

Baseline System 9 fan details

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, We have zones in our project which are addressed to system 9 (heating only).

1
Tue Jul 5, 2016, 1:48 pm

Commercial Interior; EAc1.3

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Marcus, Could you please advice me about the following situation: Regarding Option 1 of credit EAc1.3 of CI, the reviewers are requesting an extra CO2 sensor to be added for the densely occupied

1
Tue Aug 16, 2016, 4:02 pm

Exterior smoking policy

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Andrey Tsvetkov  on 

Dear all, We have a question about exterior non-smoking policy on the project NC.

1
Sat Aug 26, 2017, 8:38 pm

Underground infiltration tank

NC-v4 SSc4:Rainwater management
posted by  Frantisek Macholda  on 

Hello, our project is constrution of the new storage hall on the place of the previously existing old one. (Demolition + new construction).

1
Wed Aug 9, 2017, 7:53 pm