Sensors calibration during the performace period
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Agnieszka Rylska on
Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet?
access to medical point and massage point
NC-2009 IDc1:Innovation in Designposted by Agnieszka Rylska on
We are considering options for innovation credits.
renovation of multiple non-contiguous parts of an office
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Agnieszka Rylska on
The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.
Baseline Garage Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is:
LEED EBOM
Pilot-Credits EQpc78:Design for active occupantsposted by Lukas Urban on
Hi! Can we use this Pilot-Credit in a LEED EBOM project? Our staircase meets almost all the conditions. Thank you.
VRP Compliance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Regarding VRP Compliance Calculator (IEQp1), there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several
Baseline System 9 fan details
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, We have zones in our project which are addressed to system 9 (heating only).
Commercial Interior; EAc1.3
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Marcus, Could you please advice me about the following situation: Regarding Option 1 of credit EAc1.3 of CI, the reviewers are requesting an extra CO2 sensor to be added for the densely occupied
Exterior smoking policy
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Andrey Tsvetkov on
Dear all, We have a question about exterior non-smoking policy on the project NC.
Underground infiltration tank
NC-v4 SSc4:Rainwater managementposted by Frantisek Macholda on
Hello, our project is constrution of the new storage hall on the place of the previously existing old one. (Demolition + new construction).