Forum quick links
A division of recyclables outside the LEED project boundary
CI-v4 MRp1:Storage and collection of recyclablesposted by Alina Shilenko on
Good evening!
ID for smog sensors and anti-smog masks
NC-2009 IDc1:Innovation in designposted by Natalia Kwiecinska on
Our project is a hotel located in the city with huge problem with air pollution-smog. During 76 days in the year, the concentration of PM10 in the air is over the permitted limit.
theatre/music/ event room in hotel project
NC-2009 IEQc8.1:Daylight and views - daylightposted by Natalia Kwiecinska on
Hi everyone,
I am documenting a hotel project. One issue is not obvious for me, so maybe someone can help.
The solar reflectance index
NC-2009 SSc7.2:Heat island effect - roofposted by Marina Tykvina on
Hello!
In accordance with what method can make measurements of the value of SRI for granite with a uniformly rough surface with a height of uneven reliefs up to 5 mm?
entrance to a roof terrace
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Agnieszka Rylska on
I would like to ask if an entrance to a roof terrace is considered a regularly used exterior entrance which needs a 3m long enetryway system?
Option 1 | expressway as site used for industrial or commercial purposes
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Agnieszka Rylska on
In Option 1 of the credit guidelines, there is the requirement that adjacent site must be currently used for industrial or commercial purposes.
Which part of a toilet need water label?
CI-v4 WEp1:Indoor water use reductionposted by Katarzyna Toczynska on
Hi,
we're just deciding on water fixtures on our project and have some trouble with choosing water closets. Our toilets consist of:
- a separate bowl
Modeling "cool roof"
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
The project we are modeling is located in climate zone 6. The proposed case has decided to use “cool roof: with SRI of 0.44 (reflectance 0.39 and emittance 0,89).
Multiple buildings
posted by Markéta Vagenknechtová on
Our client wants to certify a complex of three new industrial buildings. Which rating system should we use? Can be three buildings certified as one project?