Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent
2
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Thu Aug 8, 2019, 8:04 pm

Kitchen Equipments

Retail-NC-v2009 EAc1:Optimize energy performance
posted by  Przemysław Rejczak  on 

Dear Everyone,

I am writting to enquire about Table 1-4 and Process Load Calculator that needs to be uploaded under EAc1 section.

0

Minimum Energy Performance Calculator – Performance Outputs tab

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings,

In the project we are modeling, there are On-site renewable energy production.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 19, 2019, 7:52 am

E-waste

CI-v4 MRp1:Storage and collection of recyclables
posted by  Agnieszka Rylska  on 

Is it enought that the tenant only will provide a safe storage for e-waste or is it required that the building also provides a central storage for all tenants?

1
Fri May 24, 2019, 4:57 pm

Water-less Cooling Tower

CS-v4.1 WEc3:Optimize Process Water Use
posted by  John Bello  on 

Our cooling system does not use any water. Instead we are planning to use a R410-a refrigerant. Would this classify for full compliance with Option 2 or Option 3.

0
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Jun 14, 2025, 11:19 am