Retail-NC-v2009 EAc1: Optimize energy performance 1-19 points
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To achieve levels of energy performance beyond those in the prerequisite standard to reduce environmental and economic impacts associated with excessive energy use.Requirements
Option 1. Whole building energy simulation (1-19 points)
Demonstrate a percentage improvement in the proposed building performance rating compared with the baseline building performance rating. Calculate the baseline building performance according to Appendix G of ANSI/ASHRAE/IESNA Standard 90.1–2007 (with errata but without addenda1) using a computer simulation model for the whole building project. Projects outside the U.S. may use a USGBC approved equivalent standard2. The minimum energy cost savings percentage for each point threshold is as follows:|
New Buildings |
Existing Building Renovations |
Points |
|
12% |
8% |
1 |
|
14% |
10% |
2 |
|
16% |
12% |
3 |
|
18% |
14% |
4 |
|
20% |
16% |
5 |
|
22% |
18% |
6 |
|
24% |
20% |
7 |
|
26% |
22% |
8 |
|
28% |
24% |
9 |
|
30% |
26% |
10 |
|
32% |
28% |
11 |
|
34% |
30% |
12 |
|
36% |
32% |
13 |
|
38% |
34% |
14 |
|
40% |
36% |
15 |
|
42% |
38% |
16 |
|
44% |
40% |
17 |
|
46% |
42% |
18 |
|
48% |
44% |
19 |
- Compliance with the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4, and 10.4) in Standard 90.1–2007 (with errata but without addenda1) or USGBC approved equivalent.
- Inclusion of all the energy costs within and associated with the building project.
- Comparison against a baseline building that complies with Appendix G of Standard 90.1–2007 (with errata but without addenda1) or USGBC approved equivalent. There is no default process energy cost.
- For appliances and equipment, provide cutsheets of proposed equipment and budget equipment not covered in Tables 1–4 that indicate hourly energy use. Provide a spreadsheet calculation estimating the daily use hours for each piece of equipment listed. Use the total estimated energy use in the energy simulation model as a plug load. Reduced use time (schedule change) is not a category of energy improvement in this credit. ENERGY STAR ratings and evaluations are a valid basis for performing this calculation.
- Spreadsheet calculation may also be utilized for calculation of commercial appliances energy consumption, and input into the Energy Cost Budget (ECB), in lieu of energy simulation modeling as a plug load.
- For display lighting, the space-by-space method of determining allowed lighting power under ANSI/ASHRAE/IESNA Standard 90.1–2007 must be used to determine the appropriate baseline for both the general building space and the display lighting. Installed lighting in the proposed building, including display lighting, is compared with this baseline in the simulation.
- For hard-wired refrigeration loads, the impact of energy performance improvements must be modeled with a simulation program specifically designed to account for refrigeration equipment. For example, eQUEST has a refrigeration module that can be used to simulate performance improvements in refrigeration equipment.
OR
Option 2. Prescriptive compliance path: ASHRAE Advanced Energy Design Guide (1 point)
Comply with the prescriptive measures of the ASHRAE Advanced Energy Design Guide for Retail Buildings 2006. Project teams must fully comply with all applicable criteria as established in the Advanced Energy Design Guide for the climate zone in which the building is located. Projects outside the U.S. may use ASHRAE/ASHRAE/IESNA Standard 90.1-2007 Appendices B and D to determine the appropriate climate zone. The building must meet the following requirements:- Less than 20,000 square feet (1,800 square meters).
- Retail occupancy.
AND
Projects must comply with the prescriptive measures on Tables 1–4 for 90% of total energy consumption for all process equipment.OR
Option 3. Prescriptive compliance path: Advanced Buildings™ Core Performance™ Guide (1-3 points)
Comply with the prescriptive measures identified in the Advanced Buildings™ Core Performance™ Guide developed by the New Buildings Institute. The building must meet the following requirements:- Less than 100,000 square feet (9,300 square meters).
- Comply with Section 1, Design Process Strategies, and Section 2, Core Performance Requirements.
- Health care, warehouse, or laboratory projects are ineligible for this path.
- 1 point is available for all office, school, public assembly, and retail projects less than 100,000 square feet (9,300 square meters) that comply with Sections 1 and 2 of the Core Performance Guide.
- Up to 2 additional points are available to projects that implement performance strategies listed in Section 3, Enhanced Performance. For every 3 strategies implemented from this section, 1 point is available.
- The following strategies are addressed by other aspects of LEED and are not eligible for additional points under EA Credit 1:
- 3.1—Cool Roofs
- 3.8—Night Venting
- 3.13—Additional Commissioning
AND
Projects must comply with the prescriptive measures in Tables 1–4 for 90% of total energy consumption for all process equipment.Table 1. Commercial Kitchen Appliance Prescriptive Measures and Baseline for Energy Cost Budget
[view:embed_resource=page_1=2600980]Table 2. Supermarket Refrigeration Prescriptive Measures and Baseline for Energy Cost Budget
Item |
Attribute |
Prescriptive Measures |
Baseline |
|---|---|---|---|
Evaporator |
Evaporator fan speed control |
Variable speed evaporator fan |
Constant volume, constant operation |
Evaporator design approach temperature |
10°F (-12.2°C) |
10°F (-12.2°C) |
|
Condenser |
Air cooled condenser fan speed control |
Variable Speed Condenser Fan (electronically commutated motors if single phase and less than 1 hp) |
Cycling one speed fan |
Air cooled condenser design approach |
Floating head pressure, min of 70°F (21.1°C), 5°F (-15°C) drybulb offset |
10°F to 15°F (-12.2°C to -9.4°C) depending on suction temperature |
|
Air cooled condenser fan power |
80 Btu/Watt-hr at 10°F (-12.2°C) approach temperature |
53 Btu/Watt-hr at 10°F (-12.2°C) approach temperature |
|
Evaporative condenser fan speed control |
Variable speed condenser fan (electronically commutated motors if single phase and less than 1 hp) |
Cycling one speed fan |
|
Evaporative condenser design approach temperature |
Floating head pressure, min of 70°F (21.1°C), 9°F (-12.8°C) wetbulb offset |
18°F to 25°F (-7.8°C to -3.9°C) based on design wetbulb temperature |
|
Evaporative condenser fan and pump power |
400 Btu/Watt-hr at 100°F (37.8°C) saturated condensing temperature and 70°F (21.1°C) wetbulb temperature |
330 Btu/Watt-hr at 100°F (37.8°C) saturated condensing temperature and 70°F (21.1°C) wetbulb temperature |
|
Refrigeration System |
Suction pressure control |
Not addressed |
Not addressed |
Condensing temperature control |
85°F (29.4°C) minimum condensing temperature, fixed setpoint |
85°F (29.4°C) minimum condensing temperature, fixed setpoint |
|
Defrost control |
No electrical defrost. Hot gas defrost only |
Not addressed |
|
Compressor |
Compressor capacity modulation |
Variable speed drive trim compressor |
Slide valves on screw compressors, multiple compressor racks on reciprocating compressor plants |
Table 3. Walk-in Coolers and Freezers Prescriptive Measures and Baseline for Energy Cost Budget
Item |
Attribute |
Prescriptive Measures |
Baseline |
|---|---|---|---|
Envelope |
Freezer insulation |
R-46 |
R-36 |
Cooler insulation |
R-36 |
R-20 |
|
Automatic closer doors |
Yes |
No |
|
High efficiency low/no heat reach-in doors |
40W/ft (13.12 W/mm) of door frame (low temperature) 17W/ft (5.58 W/mm) of door frame (medium temperature) |
40W/ft (13.12 W/mm) of door frame (low temperature) 17W/ft (5.58 W/mm) of door frame (medium temperature) |
|
Evaporator |
Evaporator fan motor and control |
Shaded pole and split phase motors are prohibited. Use PSC or EMC motors. |
Constant speed fan |
Hot gas defrost |
Yes, no electrical defrosting |
Electric defrost |
|
Condenser |
Air cooled condenser fan motor and control |
Shaded pole and split phase motors are prohibited. Use PSC or EMC motors. Add condenser fan controllers |
Cycling one speed fan |
Air cooled condenser design approach |
Floating head pressure controls or ambient sub-cooling |
10°F to 15°F (-12.2°C to -9.4°C) dependent on suction temperature |
|
Lighting |
Lighting power density (W/sq.ft.) (W/m2) |
0.6 W/sq.ft. (6.46 W/m2) |
0.6 W/sq.ft. (6.46 W/m2) |
|
Strategies |
Prescriptive Measures |
Baseline |
|
Make-up air strategies |
Dedicated make-up air system |
Transfer air through dining area |
|
Exhaust rate control |
Demand control package |
Constant volume |
Pilot ACPs Available
The following pilot alternative compliance path is available for this credit. See the pilot credit library for more information. EApc95: Alternative Energy Performance Metric ACPWhat does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To achieve levels of energy performance beyond those in the prerequisite standard to reduce environmental and economic impacts associated with excessive energy use.Requirements
Option 1. Whole building energy simulation (1-19 points)
Demonstrate a percentage improvement in the proposed building performance rating compared with the baseline building performance rating. Calculate the baseline building performance according to Appendix G of ANSI/ASHRAE/IESNA Standard 90.1–2007 (with errata but without addenda1) using a computer simulation model for the whole building project. Projects outside the U.S. may use a USGBC approved equivalent standard2. The minimum energy cost savings percentage for each point threshold is as follows:|
New Buildings |
Existing Building Renovations |
Points |
|
12% |
8% |
1 |
|
14% |
10% |
2 |
|
16% |
12% |
3 |
|
18% |
14% |
4 |
|
20% |
16% |
5 |
|
22% |
18% |
6 |
|
24% |
20% |
7 |
|
26% |
22% |
8 |
|
28% |
24% |
9 |
|
30% |
26% |
10 |
|
32% |
28% |
11 |
|
34% |
30% |
12 |
|
36% |
32% |
13 |
|
38% |
34% |
14 |
|
40% |
36% |
15 |
|
42% |
38% |
16 |
|
44% |
40% |
17 |
|
46% |
42% |
18 |
|
48% |
44% |
19 |
- Compliance with the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4, and 10.4) in Standard 90.1–2007 (with errata but without addenda1) or USGBC approved equivalent.
- Inclusion of all the energy costs within and associated with the building project.
- Comparison against a baseline building that complies with Appendix G of Standard 90.1–2007 (with errata but without addenda1) or USGBC approved equivalent. There is no default process energy cost.
- For appliances and equipment, provide cutsheets of proposed equipment and budget equipment not covered in Tables 1–4 that indicate hourly energy use. Provide a spreadsheet calculation estimating the daily use hours for each piece of equipment listed. Use the total estimated energy use in the energy simulation model as a plug load. Reduced use time (schedule change) is not a category of energy improvement in this credit. ENERGY STAR ratings and evaluations are a valid basis for performing this calculation.
- Spreadsheet calculation may also be utilized for calculation of commercial appliances energy consumption, and input into the Energy Cost Budget (ECB), in lieu of energy simulation modeling as a plug load.
- For display lighting, the space-by-space method of determining allowed lighting power under ANSI/ASHRAE/IESNA Standard 90.1–2007 must be used to determine the appropriate baseline for both the general building space and the display lighting. Installed lighting in the proposed building, including display lighting, is compared with this baseline in the simulation.
- For hard-wired refrigeration loads, the impact of energy performance improvements must be modeled with a simulation program specifically designed to account for refrigeration equipment. For example, eQUEST has a refrigeration module that can be used to simulate performance improvements in refrigeration equipment.
OR
Option 2. Prescriptive compliance path: ASHRAE Advanced Energy Design Guide (1 point)
Comply with the prescriptive measures of the ASHRAE Advanced Energy Design Guide for Retail Buildings 2006. Project teams must fully comply with all applicable criteria as established in the Advanced Energy Design Guide for the climate zone in which the building is located. Projects outside the U.S. may use ASHRAE/ASHRAE/IESNA Standard 90.1-2007 Appendices B and D to determine the appropriate climate zone. The building must meet the following requirements:- Less than 20,000 square feet (1,800 square meters).
- Retail occupancy.
AND
Projects must comply with the prescriptive measures on Tables 1–4 for 90% of total energy consumption for all process equipment.OR
Option 3. Prescriptive compliance path: Advanced Buildings™ Core Performance™ Guide (1-3 points)
Comply with the prescriptive measures identified in the Advanced Buildings™ Core Performance™ Guide developed by the New Buildings Institute. The building must meet the following requirements:- Less than 100,000 square feet (9,300 square meters).
- Comply with Section 1, Design Process Strategies, and Section 2, Core Performance Requirements.
- Health care, warehouse, or laboratory projects are ineligible for this path.
- 1 point is available for all office, school, public assembly, and retail projects less than 100,000 square feet (9,300 square meters) that comply with Sections 1 and 2 of the Core Performance Guide.
- Up to 2 additional points are available to projects that implement performance strategies listed in Section 3, Enhanced Performance. For every 3 strategies implemented from this section, 1 point is available.
- The following strategies are addressed by other aspects of LEED and are not eligible for additional points under EA Credit 1:
- 3.1—Cool Roofs
- 3.8—Night Venting
- 3.13—Additional Commissioning
AND
Projects must comply with the prescriptive measures in Tables 1–4 for 90% of total energy consumption for all process equipment.Table 1. Commercial Kitchen Appliance Prescriptive Measures and Baseline for Energy Cost Budget
[view:embed_resource=page_1=2600980]Table 2. Supermarket Refrigeration Prescriptive Measures and Baseline for Energy Cost Budget
Item |
Attribute |
Prescriptive Measures |
Baseline |
|---|---|---|---|
Evaporator |
Evaporator fan speed control |
Variable speed evaporator fan |
Constant volume, constant operation |
Evaporator design approach temperature |
10°F (-12.2°C) |
10°F (-12.2°C) |
|
Condenser |
Air cooled condenser fan speed control |
Variable Speed Condenser Fan (electronically commutated motors if single phase and less than 1 hp) |
Cycling one speed fan |
Air cooled condenser design approach |
Floating head pressure, min of 70°F (21.1°C), 5°F (-15°C) drybulb offset |
10°F to 15°F (-12.2°C to -9.4°C) depending on suction temperature |
|
Air cooled condenser fan power |
80 Btu/Watt-hr at 10°F (-12.2°C) approach temperature |
53 Btu/Watt-hr at 10°F (-12.2°C) approach temperature |
|
Evaporative condenser fan speed control |
Variable speed condenser fan (electronically commutated motors if single phase and less than 1 hp) |
Cycling one speed fan |
|
Evaporative condenser design approach temperature |
Floating head pressure, min of 70°F (21.1°C), 9°F (-12.8°C) wetbulb offset |
18°F to 25°F (-7.8°C to -3.9°C) based on design wetbulb temperature |
|
Evaporative condenser fan and pump power |
400 Btu/Watt-hr at 100°F (37.8°C) saturated condensing temperature and 70°F (21.1°C) wetbulb temperature |
330 Btu/Watt-hr at 100°F (37.8°C) saturated condensing temperature and 70°F (21.1°C) wetbulb temperature |
|
Refrigeration System |
Suction pressure control |
Not addressed |
Not addressed |
Condensing temperature control |
85°F (29.4°C) minimum condensing temperature, fixed setpoint |
85°F (29.4°C) minimum condensing temperature, fixed setpoint |
|
Defrost control |
No electrical defrost. Hot gas defrost only |
Not addressed |
|
Compressor |
Compressor capacity modulation |
Variable speed drive trim compressor |
Slide valves on screw compressors, multiple compressor racks on reciprocating compressor plants |
Table 3. Walk-in Coolers and Freezers Prescriptive Measures and Baseline for Energy Cost Budget
Item |
Attribute |
Prescriptive Measures |
Baseline |
|---|---|---|---|
Envelope |
Freezer insulation |
R-46 |
R-36 |
Cooler insulation |
R-36 |
R-20 |
|
Automatic closer doors |
Yes |
No |
|
High efficiency low/no heat reach-in doors |
40W/ft (13.12 W/mm) of door frame (low temperature) 17W/ft (5.58 W/mm) of door frame (medium temperature) |
40W/ft (13.12 W/mm) of door frame (low temperature) 17W/ft (5.58 W/mm) of door frame (medium temperature) |
|
Evaporator |
Evaporator fan motor and control |
Shaded pole and split phase motors are prohibited. Use PSC or EMC motors. |
Constant speed fan |
Hot gas defrost |
Yes, no electrical defrosting |
Electric defrost |
|
Condenser |
Air cooled condenser fan motor and control |
Shaded pole and split phase motors are prohibited. Use PSC or EMC motors. Add condenser fan controllers |
Cycling one speed fan |
Air cooled condenser design approach |
Floating head pressure controls or ambient sub-cooling |
10°F to 15°F (-12.2°C to -9.4°C) dependent on suction temperature |
|
Lighting |
Lighting power density (W/sq.ft.) (W/m2) |
0.6 W/sq.ft. (6.46 W/m2) |
0.6 W/sq.ft. (6.46 W/m2) |
|
Strategies |
Prescriptive Measures |
Baseline |
|
Make-up air strategies |
Dedicated make-up air system |
Transfer air through dining area |
|
Exhaust rate control |
Demand control package |
Constant volume |