Forum quick links
Water Metering
EBOM-v4 WEc4:Water meteringposted by Jorge Lopez de Obeso on
Hi, could a water mirror (infinity fountain) for humidification purpuses count as other process water?
Smoking Policy
CS-v4 EQp2:Environmental tobacco smoke controlposted by Dean Barone on
Regarding the ETS Control Requirement for LEEDv4 that prohibits smoking inside the building and within the property line. Is it allowed to provide a certain area say 11th floor for smoking?
Low emitting Material- Insulation
CS-v4.1 EQc2:Low-Emitting Materialsposted by Malin Folkesson on
Hi,
ASHRAE 90.1.2010 - Baseline System using Exception of G3.1.1
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi,
Greetings!
Hollow Metal Doors
NC-v4 EAp2:Minimum energy performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hello,
Area Under Construction
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Kelsey Kim on
For the LEED Online form, one of the last sections asks you to explain what alterations and additions were done to the building and give a value for the floor area under construction. I unders
Treatment of District source water loop for heat pumps
NC-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
I have a building that is using water source heat pumps for cooling and heating.
seeking interviews on EDI
posted by Paula Melton on
Hi! I’m working on two reports about equity, diversity, and inclusion (EDI) in the building industry, and I’m looking for contributions from you or others in your firm.
Performance Period
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Tristan Schwartzman on
If the audit was conducted in 2014 and we are submitting the LEED application in 2019, does the performance period start date need to be in 2014?
Lighting Building Area Method Takeoff Clarification
NC-v4 EAp2:Minimum energy performanceposted by RDK E&S on
Hi,