Forum quick links
Interior Paints and Coatings
NC-v4 EQc2:Low emitting materialsposted by Reinhard Oppl on
Who can help to clarify?
Design Compliance: Space activity level not addressed by ASHRAE 55-2010
NC-v4 EQc5:Thermal comfortposted by RDK E&S on
Hi all,
Cabinet Unit Heaters and Propeller Unit Heater
Schools-NC-v4.1 EQp1:Minimum Indoor Air Quality Performanceposted by Dan Cottrill on
Hello - are cabinet unit heaters and propeller unit heaters required to comply with IEQp1 / ASHRAE 62.1 section 5, systems and equipment?
Signage of preferred parking
CS-v4 LTc8:Green vehiclesposted by Erkki Seinre on
A project has smaller parking on ground level in front of the building and larger parking underground.
Making lemonade...
posted by Mona Lemoine on
World: There is no way we can shut down in order to lower emissions, slow climate change and protect the environment.
Water Requirement of Landscape Plants
NC-v4 WEc1:Outdoor water use reductionposted by Rodolfo Loro, Jr. on
Hello. I have a project that has no landscape consultant, so the architects are asking for assistance in choosing plants that will help us meet the 30% to 50% outdoor water reduction.
Water Requirement of Landscape Plants
NC-v4 WEp1:Outdoor water use reductionposted by Rodolfo Loro, Jr. on
Hello. I have a project that has no landscape consultant, so the architects are asking for assistance in choosing plants that will help us meet the 30% to 50% outdoor water reduction.
how can I calculate actual cost of Material and resource part?
posted by mohamed nur hashi on
I am university student and I am writing my thesis about leed certification, especially cost materials.
PROJECTION FACTORS FOR VERTICAL FINS
CS-v4 EAp2:Minimum energy performanceposted by Fotis Kotsopoulos on
Dear all,
Is it possible to correlate vertical fins with projection factors shown in table 5.5.4.4.1 ASHRAE 90.1-2010?
FK
Entryway System in TSLA
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Brightworks Sustainability on
My CS v4 project wants to pursue Enhanced IAQ Strategies but we are not responsible for installing entryway systems or walk-off mats.