Forum quick links
Construction IAQ Management Plan during demolition phase?
NC-v4 EQc3:Construction indoor air quality management planposted by Elizabeth Kertesz on
For a major renovation project, should we implement the Construction IAQ Management Plan in our unoccupied building during the demolition phase? The reference guide says to implement the plan
how can attachments (drawings, images) be sent in a CIR?
NC-v4 IPc1:Integrative processposted by Sara BENLOUBA on
Dear Everybody,
TOD No Minimum for Parking
NC-v4 LTc7:Reduced parking footprintposted by Graham Linn on
Hello - I have project placed within a Transit Oriented Development (TOD) Overlay. For this city the zoning code in this overlay now says there is "no minimum" for off street parking.
Creating Baseline building Shell based on ΑSHRAE 90.1-2010 - proposed building walls with more than 40% of glass
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all LEED Users,
My proposed building has following percentage of glass at each orientation:
NE: 90% percentage of glass
SE: 90% percentage of glass
Insulation in Interior walls for Vault Spaces in Data Center
NC-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi Everyone,
Phytoclimatic Glass
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Brian Harris on
We have a project that has electric photochromic Glass. The tint of the glass will change based on the sun's intensity hitting the windows.
Justification of usign the 9.6.2 Additional Power lighting in the Baseline Model
NC-v4.1 EAp2:Minimum Energy Performanceposted by Marc Maso on
Dear srs, I'm doing a convention center in Arabia Saudi and we justify the LPD of the baseline model as this way:
1) We have chosen the Basic Power Allow ASHRAE (Table G3.7)