Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

WEp1 - Handheld bidet faucets

CS-2009 WEp1:Water Use Reduction
posted by  Tapio Peltonen  on 

Every toilet stall in the project includes a handheld bidet faucet (or spray) and a lavatory. Are these calculated as lavatory faucets or ignored in the water use calculation?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 11, 2011, 5:34 pm

Deriving Minimum Efficiency Requirements for Baseline Chillers

NC-2009 EAc1:Optimize Energy Performance
posted by  heinrich post  on 

We are wondering how to interpret the Minimum Efficiency Tables of Chapter 6.8 in ASHRAE 90.1-2007 to model HVAC efficiencies of baseline equipment. Our baseline building has a floor area > 150.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 11, 2011, 4:57 pm

Accepting other testing methods

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Petra Hajná  on 

Building materials are required to comply with SCQAMD rules which state VOC limits for various types of materials.

3
Sustainability Consultant
Skanska Czech Republic
LEEDuser Basic Member
128 thumbs up
Fri Mar 11, 2011, 3:09 pm
7
Fri Mar 11, 2011, 1:58 pm

Recommissioning vs Commissioning experience for CxA

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Dustin Campbell  on 

We would like to get a comment from someone that has had experience with this: When selecting a CxA, would someone that has eperience on 2 or more projects as the "Recommissiong Authority" be suff

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 11, 2011, 12:48 pm
4
Architect
Buro Happold
LEEDuser Basic Member
55 thumbs up
Fri Mar 11, 2011, 5:02 am

double counting 7.1 and 7.2?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Christopher Sawyer  on 

My project is a bus maintaince depot in New York City with a zero lot line. The top floor (under the "roof" is all bus parking for vehicle maintenance and storage).

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 10, 2011, 11:25 pm

A person who is responsible for the thermal comfort?

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Mathilda Jonsson  on 

In the project I'm working at there are seperate office spaces.

3
Green Certification Coordinator
Skanska Sweden
LEEDuser Basic Member
20 thumbs up
Thu Mar 10, 2011, 6:44 pm
2
Default Avatar
Principal
G. F. Shymko & Associates Inc.
LEEDuser Basic Member
97 thumbs up
Thu Mar 10, 2011, 1:14 pm

M&V and metering

posted by  Emil Cuevas  on 
8
Default Avatar
Ms
LEEDuser Basic Member
31 thumbs up
Thu Mar 10, 2011, 12:56 pm