Forum quick links
stairs, electrical rooms modeled?
NC-2009 EAp2:Minimum Energy Performanceposted by AAME User on
A couple of quick reference questions: 1) I have some miscellaneous areas in my project (stairwells, electrical rooms, elevator equipment room) being served by split system AC units and 4-pipe fan
High price differences between electricity and fossil fuel
NC-2009 EAp2:Minimum Energy Performanceposted by Hélène Vieillefosse on
In our building, fossil fuel is 30 time less expensive than electricity.
Buildings with Non-Standard Space Temp/Humidity Conditions
NC-2009 EAc1:Optimize Energy Performanceposted by Evelyn Dicks, EI, CxA on
I am working on an archive library that requires 50F and 35% RH indoor space conditions.
LEED 2012 time-line
posted by Melissa Merryweather on
Have USGBC published an updated time-line for LEED 2012? I have searched without luck.
Part II is out but LEED Online is not ready for Group project??
posted by Marcio Alberto Casado Pereira on
Hello, I've ready pretty much everything that is available on AGMBC - the guide itself, forunm, FAQs - but there's so much gray area!
Level of detail needed in ESC?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Patty Breech on
This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (ESC) plan?
pursuing more credits after the performance period.
posted by Jim Park on
I am working on one EB project and it needs of more points to achieve a desired rating.
District Cooling for Humidity Control
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
I am working in a project that has no heating or cooling system, therefore I used the same HVAC system as in the proposed model (system #4: PSZ-HP).
Private vs Public Fixtures
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Garrett Billings on
I am submitting a LEED CI project in a multi-tenant building and would like to get the points.
Hotel project with multiple buildings
posted by Wei Jiang on
We are working on a resort project with multiple small buildings each with 2~3 stories. The main building house hotel public and function areas including ballroom, restaurants, ect.