Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Plumbing Commissioning Scope Of Work

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Dan Forino  on 

In LEED 4.0 it states that for plumbing all Domestic Hot Water Systems, pumps and controls.

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Fri Oct 21, 2016, 5:50 pm

contact GBCI

posted by  Tristan Roberts  on 
2
Thu Oct 20, 2016, 9:46 pm

Estimated Completion Date vs. IEQ testing

NC-2009 PIf4:Schedule and Overview Documents
posted by  Greengrade User  on 

I recall the form saying "estimated" completion date. What can you get away with with "estimated"?

5
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Wed Oct 19, 2016, 10:24 pm

Decorative Exterior Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Saif Abdulameer  on 

Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.

2
ASHRAE BEMP HBDP - LEED GA, Building Performance Consultant
Zonda
LEEDuser Basic Member
14 thumbs up
Wed Oct 19, 2016, 9:57 pm

Equation2: Monthly harvested rainwater volume. (v4)

NC-v4 WEc1:Outdoor water use reduction
posted by  deepak cherukumilli  on 

Reference guide v4 BD+C:Page290: STEP 5: I didnot understand why a 0.15 is used in this equation. Is this for any kind of losses in the rain water storage process.

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Wed Oct 19, 2016, 9:13 pm

pilot survey problems

Pilot-Credits EQpc78:Design for active occupants
posted by  M Bordeaux  on 

I have a LEED 2009 project and we are trying to go for a pilot credit - design for active occupants.

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Oct 19, 2016, 6:31 pm

New Option - Walking Path

Pilot-Credits EQpc78:Design for active occupants
posted by  Garrett Ferguson  on 

On a LEED-CI project where the interior will be renovated, the project owner encourages walking. A walking path has been provided that overlooks an atrium and is daylit with a skylight.

2
Default Avatar
Architect
Gresham Smith & Partners
LEEDuser Basic Member
6 thumbs up
Wed Oct 19, 2016, 6:05 pm

New Construction - ELODIE Tool

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Ian McCall  on 

Hello, I am working in France where we analysis the Life Cycle Impacts of materials using the European standards notably ISO 21930 / EN 15804 & NF P01-010.

5
Wed Oct 19, 2016, 1:43 pm

Operating energy performance

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Noriko Nagazumi  on 

On the FAQ of this page the following is written: How does the LCA consider operating energy?

5
Wed Oct 19, 2016, 5:39 am

certified wood credit

NC-2009 MRc7:Certified Wood
posted by  Shawn Keith  on 

My project specs have put casework into division 12. Do I have to include these in my calcs for MR C 7?

2
Default Avatar
Kohout Woodwork, Inc
LEEDuser Basic Member
8 thumbs up
Tue Oct 18, 2016, 6:53 pm