Controllability of lighting in Shared Area

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jonathan Mak  on 

We are having a hotel project that would like to attempt this credit.

2
Thu Jun 22, 2017, 6:14 am

Baseline Hot water pump power for Purchased heat

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, The project we are modeling follows LEDD v3 - 2007 (System 7) and the heating source is purchased heat. There are two question related to this issue. 1.

3
Default Avatar
Vice President / Principal
2rw Consultants, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Jun 21, 2017, 7:54 pm

Reduced Truck Idling

Warehouses-NC-v4 LTc8:Green vehicles
posted by  Michelle Rosenberger  on 

Okay first up, I'm confused. The Birds Eye Language above is for the regular New Construction options, not for the Warehouses and Distribution options.

2
Default Avatar
Sustainability Coordinator
DES Architects + Engineers
LEEDuser Basic Member
5 thumbs up
Wed Jun 21, 2017, 5:09 pm

Existing Landscape Area

ND-Plan-v4 GIBc4:Outdoor water use reduction
posted by  Noriko Nagazumi  on 

Hi, Our project has a portion of existing landscaped area within the project boundary.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Jun 21, 2017, 8:38 am

Where did my ID credits go?

Navigating LEED Online
posted by  Deborah Lucking  on 
Well, yes, the Credit Category is still there, as are IDc1.1, 1.2, etc. But the ability to change the name to a specific credit has disappeared.
12
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Jun 20, 2017, 10:27 pm

Peak building users (FTE + Peak Transients)

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Sara Johansson  on 

I am working on a LEED v.2009 CS project, using deafault occupancy Core and Shell Appendix 1. I assume that FTE and transients here are average transients?

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Jun 20, 2017, 10:25 am

Changing Facilities

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Sara Johansson  on 

I am working on a LEED CS v.2009 project greater than 300 000 sf. In the LEED Online form I have to fill out number of changing facilities and number of showers.

3
LEED® AP O+M
Skanska Sverige AB
LEEDuser Basic Member
2 thumbs up
Tue Jun 20, 2017, 9:15 am

stones found onsite & reuse of shutters for use in project

NC-2009 MRc4:Recycled Content
posted by  Debra a. Lombard  on 

1. We have a project site that's circa 1813 in the historic French Quarter.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Jun 19, 2017, 10:08 pm

Manufacturer Inventory

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Jason Grant  on 

Hi Paula - If an engineered wood flooring manufacturer wanted to qualify a product line under Option 1, is it safe to assume that they would just need to publish the list of chemical ingredients of

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Jun 19, 2017, 5:02 pm

LEED Runoff Coefficients for BMPs

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Timothy Brown  on 

I am finding it difficult to locate standard CN values for BMPs. There are not many studies out there and the ones I have found have calculated large ranges for permeable pavers, green roofs etc.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Jun 19, 2017, 1:36 pm