ASHRAE 90.1-2007: Minimum Efficiency Requirements (Heat pump)

NC-2009 EAp2:Minimum Energy Performance
posted by  Jorge Mato Rial  on 

Hello Everyone: I am working in an office building project located in Galicia (Spain). We are carrying out the selection process of the heat pump for the air conditioning of the building.

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 5, 2017, 6:53 am

LEED v4 Requirements documentation

LEED Canada Forum
posted by  nancy picard  on 

Hi, I've been searching for LEED v4 Canadian Construction Documents (01 35 21), but the update hasn't been performed yet.

6
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Thu Jun 29, 2017, 8:01 pm

dimension calculation methodology

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Noriko Nagazumi  on 

When we calculate "regulary occupied space" for EQc8.2, is it supposed to be inside of wall or "center on center" ?

7
Senior Program Manager, Sustainable Buildings, WWS
Amazon
LEEDuser Basic Member
8 thumbs up
Tue Jun 27, 2017, 5:22 pm

HERS rating for 3-Stories multifamily building

ND-v2009 GIBp2:Minimum building energy efficiency
posted by  Mugdha Mokashi  on 

For low-rise multifamily buildings is it possible to show compliance with this prerequisite by achieving a HERS index of less than 75?

3
Tue Jun 27, 2017, 4:12 pm

Exterior lighting not yet designed

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, The project we are modeling at the moment is supposed to have exterior lighting for the facades, some parking lots and some walkways. The exact LPD however is still to be calculated and

4
Tue Jun 27, 2017, 2:23 pm

Existing constructions and non infiltration water tanks

ND-v2009 GIBc8:Rainwater management
posted by  Noriko Nagazumi  on 

Hello. Two questions: Are existing constructions required to be part of the project stormwater management? The reference book wording refers to "management plan for the project".

3
Tue Jun 27, 2017, 5:14 am

Baseline Garage Ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, In our project (registered as per LEEDv2009) there are several garage ventilations. According to ASHRAE 62.1-2007, the garage exhaust rate is to be sized to 0.75 cfm/ sq.ft.

3
Mon Jun 26, 2017, 6:43 pm

Energy Rates for CHP used Project

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All Our Project have CHP (2 CNG Generator 500Kw with VAM Chillier 100TR) what is rate we use for BASE Case and Design Case For Design case we use the Fuel(CNG) cost invested to run a Gener

5
Mon Jun 26, 2017, 1:24 pm

Project with no off-street parking spaces

ND-Plan-v4 NPDc5:Reduced parking footprint
posted by  Noriko Nagazumi  on 

Hi, Our project has no off-street parking spaces.

9
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Jun 26, 2017, 4:41 am

Modeling Limitations to the Simulation Program

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Vasileios Kalfountzos  on 

I am currently working on developing the baseline building for our Energy modelling and I'm stuck on the following point of Table G3.1 point 13. "If the simulation program cannot model a component

2
Thu Jun 22, 2017, 1:17 pm