Forum quick links
Alternative Compliance Path - C&S LEED Threshold reduction
CS-v4 EAp2:Minimum energy performanceposted by MKK LEED on
Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?
Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Ed Kokosa on
I've seen previous versions of this question on the forum and the typical answer is to look at design information provided by diffuser manufacturers. As others have replied back, the standard is to
Site Fill as Regional/Recycled Material...
CS-2009 MRc4:Recycled Contentposted by Rick Alfandre on
Looking to confirm: We are using subgrade Fill for our building project that was procured from an on-site location.
Regularly Occupied Spaces Consistency Across All Credits
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Summer Minchew on
We provided a sample floor plan of future tenant area to document this credit.
Possible Exclusion??
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Nate Steeber on
My team has a unique project (I suppose most are) - part of it is a cheese processing facility.
Proposed Case-Process Load
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi, Is there any limitations in LEED V4 regarding process energy that it should be minimum 25% (In proposed case) of the baseline energy cost for the building.
Multifamily Buildings
EBOM-v4 WEp1:Indoor water use reductionposted by Zachary Sherman on
For multifamily buildings where the residents are responsible for purchasing and installing fixtures, for Option 1 do I need to survey every fixture in every apartment?
Above ground-floor horizontal exterior spaces (plaza, roof)
NC-v4 SSc6:Light pollution reductionposted by Jill Perry, PE on
Forgive me if this was covered elsewhere but I couldn't find it.
Demand Response on Campus applied to CI (2009) project?
NC-v4 EAc4:Demand responseposted by Margaret Montgomery on
We're doing a project that is >75% of the interior of the building (nearly all of it), but is considered CI.
EPD for Products + installation Materials, all as one?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Len Sciarra on
If we have a ceramic tile wall, do we count the EPD's (if we could get them) for the Tile separate from the Thinset and the Grout, or would all three products be considered as 1 EPD?