Forum quick links
Separate Changing and Shower Rooms
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Tee Howard on
I would like to clarify the LEED V2009 requirement for Showers and Changing Rooms.
Entryway Systems Location
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Tee Howard on
Context: The vestibule of our commercial building has entry/exit portals; but only leads users to an unenclosed (shell-like, meaning walls on two sides and two big openings to pass thru, and a trel
ROCKY SOIL
NC-v4 SSc2:Site development - protect or restore habitatposted by soha yamani on
in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ?
Add row to purchasing calculator
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Mihir Parikh on
I'm trying to add a data row to the calculator and it seems to be locked and requires a password. Is there any way to add in a row to the calculator?
Condenser water
CS-v4 EAc3:Advanced energy meteringposted by MKK LEED on
Hi, We are providing condenser water to the floors of a core and shell building for tenant installed heat pumps throughout.
Building and Material Reuse
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
I'm selecting Option 3 for building and material reuse.
Concrete and Asphalt from Demolition
NC-v4 MRc5:Construction and demolition waste managementposted by James Keohane on
What is the best way to include demolition materials such as concrete and asphalt in CWM calculation?
Incineration Option for Diversion Method
NC-v4 MRc5:Construction and demolition waste managementposted by James Keohane on
1.Incineration may be considered "if reuse and recycling methods are not readily available"...........How will Reviewers define "readily available"? 2.
Do the bike racks need to be covered? Definition of 'secure'?
CS-v4 LTc6:Bicycle facilitiesposted by Jay Murray on
This is a commercial project, LEED v4 CS. We have a requirement of 4 racks for visitors and 7 racks for FTE, we want to put a 12 space rack within 100 feet from the main entrance.
Option 1 - how to account for a structural truss in the calcs
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Jeremy Knoll on
In our classrooms and other core learning spaces, we are leaving a concrete, pan joist system exposed.