There is a conflict with the Online form and the Reference guide/LEED Online. Both LEED Online and Reference guide clearly state that EV Charging stations must be 2% of total Parking spaces. The online form which I've triple checked says 3%. USGBC has to clarify. Is it 2 or 3% of total parking? Thank you.