Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Audit Documentation

EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Program
posted by  Trevor Gilbert  on 

I am working on an office building that is 16 floors with each floor approximately 18,000 sf.

1
Mon Nov 30, 2015, 8:53 pm

Daylighting in ECB Method

NC-2009 EAp2:Minimum Energy Performance
posted by  Mark Benson  on 

I know that I can take credit for automatic daylighting controls under the Performance Rating Method of Appendix G.

1
Tue Mar 4, 2014, 2:53 pm

Rubber Grating

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Charline SEYTIER  on 

There's been discussions about rubber mats but we are dealing with a question concerning rubber grating that will come with a non-slip metal frame. Per our understanding, being grates, no weekly m

1
Tue Mar 4, 2014, 5:57 pm

Breaks, Holidays, and PTO

NC-2009 PIf3:Occupant and Usage Data
posted by  Jamison Hill  on 

Hey LEEDUsers, How should we account for lunch break, paid holidays, and annual leave/PTO in our FTE calculations? 1.

1
Fri Mar 7, 2014, 3:53 pm

Zero Lot Line Building

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Jamison Hill  on 

My Building is a zero lot line building. The front of the building directly abuts a public sidewalk and the sides abut adjacent buildings.

1
Tue Mar 4, 2014, 10:53 pm

Ventilation rates for manufacturing facilities

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Omar Delgado  on 

I'm analyzing a manufacturing plant which is 70% manufacturing space and 30% warehouse. Do I need to follow the ACGIH Industrial Ventilation Manual to comply with this credit ?

1
Wed Mar 4, 2015, 3:15 pm

No documents to prove compiance

CS-2009 SSc1:Site Selection
posted by  Saud Abdul Rasheed  on 

Hello everyone, For pursuing this credit we need the documents mentioned above. What if all these documents cannot be furnished as the project is located outside the US?

0

Am i required to do the Level I first

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Chris Callas  on 

We are looking to do this in-house, we can document the study and record the findings. but as part of this credit do i need to show i performed the Level I first?

1
Wed Mar 5, 2014, 5:09 pm

Ceiling mounted fans

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Donald Green  on 

Can a multi-speed ceiling mounted fan be considered as a thermal comfort control in either a single office space or a multi-occupant space? It is understood per the Addendum mentioned above that a

1
Wed Mar 5, 2014, 8:55 pm

Identifying LEED boundary to exclude portion of project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kristen Dotson  on 

The registered project includes commercial core and shell space with an adjoining housing tower which will be scored under the Evergreen Sustainable Development Standard.

1
Sat Mar 8, 2014, 3:37 am