Pilot-Credits PC60:Integrative Processposted by Janna Alampi on
Building design should always be an integrative process. The tools found in this Pilot Credit would benefit any project.
Water cooled chillers for very dry areas
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear forum, We have a very critical problem for a LEED C&S 2009 project located in the north of Mexico. The project will be a 13th story office building.
What about metal structure or legs of workstation?
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Jim Park on
One project is purchasing Greenguard certified workstation (panel), however my client told me that the metal legs are going to be provided by other vendor.
LOV3 now
posted by Katherine Carlin on
Hi, can anyone tell me how to make the LOV3 work on any current browser? I have tried on a Mac and on a Windows machine. I can't register a project.
Non-FSC Certifications?
NC-2009 MRc7:Certified Woodposted by Andrea Anderson on
We have had a wood submittal that has a several green certifications including NGBS Green Certification, SCS EPP Certification, and UL Greenguard Gold Certifications.
Option 2: Prescriptive Method Skylight Inclusion
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Annalise Reichert on
I am working on a project using the prescriptive daylighting method for achieving IEQc8.1 The project has both sidelighting and toplighting.
Gravel as a part of green roofs
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Alexia Anastassiadis on
Hi! We are working on a project that has a large green roof. Some parts of it are covered with gravel (crushed stone) as a surface to walk on.
Submitted 3 buildings as group- but 1 did not get a permit
posted by Ilan Yahav on
We are in the process of submitted the design phase for 3 residential buildings as a group under the LEED for new construction but one of the buildings seems to have problem's getting a permit.
Base build pumps and fans
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mike D on
Hello, If all central pumps and fans are base build, does section 3.10 of the form need to be completed? Also, does the 'Total tenant space fan and pump sizing' under section 1.4 have to be filled
Combine Option 1 and Option 2?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Eleni Tsivitzi on
I was just wondering if anyone has attempted combining compliant SRI/shading by trees (option 1) with underground parking (option 2) for this credit.