Energy Star: Tenant problem

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Hatice G.  on 

Hi, I am working on a multi-tenant office building. One tenant with over 70% of the rented area doesn't want to give their concsumption data.

1
Mon Feb 17, 2014, 5:21 pm

Do I model part-load curve for the DES default efficiency?

General forums
posted by  X. Chen  on 

The DES guideline (2010) allows us to model DES cooling plant with a COP of 4.4, which includes cooling towers and primary pumps.

1
Mon Feb 10, 2014, 2:33 pm

Farmland Development?

NC-2009 SSc1:Site Selection
posted by  Cynthia Estrada  on 

We have a site that has a strip of prime farmland, which we are not building on per se. We have a retention pond with a water feature in mind for that area.

1
Wed Feb 5, 2014, 6:23 pm

Exempting Space for LEED EBOM

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michael McPheron  on 

Our building includes offices attached to a manufacturing facility by a hallway and kitchen area. The initial goal was to just get the offices and kitchen area LEED certified for EBOM.

1
Sat Mar 8, 2014, 3:36 am

lab casework

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Ashonta Langdon  on 

Would lab casework like in this brochure fall under the 'systems furniture' definition of this credit? Thank you. https://fscimage.fishersci.com/images/D16549~.pdf

1
Sat Feb 8, 2014, 4:05 pm

What certifications are accepted by USGBC for v4 low-emissions?

CI-v4 EQc2:Low emitting materials
posted by  Randal Carter  on 

The USGBC has posted, and will continue updating, a "Low-Emitting Materials Third-Party Certifications table" at this link: http://www.usgbc.org/resources/low-emitting-materials-third-party-cert

1
Sat Aug 26, 2017, 9:32 pm

SSc7.1: Heat Island Effect—Non-Roof

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Sahar Abi-Ziki  on 

Hello, Our project have 346 parking spaces on 4 underground levels , only 35 will be outside and will not be covered.

1
Fri Feb 7, 2014, 1:27 pm

IEQ 6.1 Task Lighting

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Samuel Nation  on 

The owner has committed to providing desk lamps to open office areas to meet individual control at work stations. The work stations however, are not officially part of the project.

1
Wed Jun 11, 2014, 7:19 pm

Hotel Guest Room Controllability

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Tom Warner  on 

The IEQ Space Matrix indicates that hotel guest rooms can be excluded from the calculations for both IEQc6.1 Controllability of Systems - Lighting and IEQc6.2 Controllability of Systems - Thermal C

0

carbon trust guide/CIBSE 2005

NC-2009 IEQc2:Increased Ventilation
posted by  christopher brown  on 

does anyone have .pdf copies of the recommended guidelines for reference?

1
Sat Mar 8, 2014, 2:59 am