Does type of signage matter?
CI-v4 EQp2:Environmental tobacco smoke controlposted by Edgar Arevalo on
Does it matter the type of signage that's displayed at the entries of the building? I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly
Diverse uses outside the project boundary/ tenant fitout area but within the same building
CI-v4 LTc2:Surrounding density and diverse usesposted by Ranya Metwalli Shields on
Our project is a retail tenant located within a mall.
Difference between v4 and v4.1
Pilot-Credits EApc161:Electrification ACP: Energy Simulation Performance Pathposted by Camilo Velez on
Good evening,
I have been reading about this ACP, but there are a couple of questions that I still have regarding the applicability:
CARE(Carbon Avoided Retrofit Estimator)
posted by Teresa Jan on
Anyone know what stages does CARE include? Does it include B1-5, C1-4 or D?
Thank you!
Can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized for credit compliance?
Healthcare-v4.1 EAc3:Advanced Energy Meteringposted by Keith Robertson on
For low-level metering of loads, greater than 10% can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized to collect data in accordance with obtaining&nbs
Option 1 Path 2/3 - Natural Ventilation and DES
CS-v4 EAp2:Minimum energy performanceposted by Azra on
Hello,
we got a kind of an unusal situation here, at least for us.
Modeling indirectly conditioned spaces
NC-v4 EAp2:Minimum energy performanceposted by Gaston Michaud on
Hi all,
We are working in a CS project, and just got back the following comment from the LEED Reviewer:
Modeling Proposed DHW with Insulation
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am Modeling a DHW system and most of my savings are coming from Insulation in the heater tank, now the LEED reviewer said that the savings should be modeled with Exceptional Calculation MEthod
Onsite and Offsite Both?
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Umesh Atre on
Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?
Can ID+C be selected for whole building?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Leo LeQuoc on
Our team is working on a project of a whole 2-storey (to be) newly constructed office building.