Issues Minimum Energy Performance Calculator

NC-v4 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Dear All:-

we have working LEED Group Project Building with 5 nos of Building

2
Default Avatar
President, CEO
design2 LAST, inc
LEEDuser Premium Member
1 thumbs up
Thu May 21, 2026, 4:09 pm

Managing rainwater in clay soil with low permeability

CS-v4 SSc4:Rainwater management
posted by  Maria Glädt  on 

Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).

3
Thu May 21, 2026, 3:10 pm
9
Thu May 21, 2026, 7:33 am

Rainwater management for large industrial site

NC-v4 SSc4:Rainwater management
posted by  Erin Holdenried  on 

Hello - We have a large industrial site that is using a pond to manage about 25% of the rainwater and a vegetated channel to manage about 75% of the rainwater.  I believe the vegetated channel

2
Thu May 21, 2026, 12:19 am

Has the Composting credit been achieved with limited composting receptacles in the building?

Pilot-Credits SSpc129:Comprehensive Composting
posted by  Kristen Fritsch  on 

The amount or spacing of receptacles are not necessarily spelled out, as w/ the recycle bins, and mainly the only place I am drawing from that it should be provided in all spaces is in the "Require

5
Senior Consultant
Greenwood Consulting Group
LEEDuser Premium Member
4 thumbs up
Wed May 20, 2026, 5:51 am

Trees sf calculation for Protect or Restore Habitat v4.1

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Maya Facciolo  on 

How do we calculate the square footage for contiguous trees for Protect or Restore Habitat v4.1?

1
Ecological Design Consultant
Bio Studio
LEEDuser Premium Member
0 thumbs up
Thu May 14, 2026, 5:59 pm

Furniture Reuse

CI-v4.1 MRc4:Sourcing of Raw Materials
posted by  Dyllon Leather  on 

A project is renovating the 3 floors it occupies in an office building.

0

Embedded Grout Applications - VOC Requirements

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Faran Arshad Chohan  on 

If a grout product is being used within concrete/foundation works (non-finish application), where the material will be fully embedded and not exposed to occupied indoor spaces or interior air durin

3
Thu May 14, 2026, 12:25 pm

Clarification on LEED Low-Emitting Materials Applicability for Concrete Curing Compounds

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Faran Arshad Chohan  on 

We would appreciate clarification regarding the applicability of LEED v4/v4.1 Low-Emitting Materials requirements for concrete curing compounds used as part of cast-in-place concrete works.

3