Airconditioning for process requirement
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Hi, We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement).
Base Model using Option D
NC-2009 EAc5:Measurement and Verificationposted by Kalyan Nishtala on
This is the first time I am dealing with this credit. I am confused with what the base mode (using option D) entails.
50% or Residents and Buildings with Access
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Sara Zoumbaris on
My question is in regards to the 50% requirement of residents and the # of weekday trips.
Bus Stops Planned, Not Yet Built
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Sara Zoumbaris on
I am hoping someone can confirm for me whether planned bus stops which are not yet official/ in place but are guaranteed, may be included for credit achievement?
Site lighting outside the LEED project boundary?
NC-2009 EAp2:Minimum Energy Performanceposted by Anya Fiechtl on
Our project is within a larger property owned by the same entity, and some illuminated paths and roads extend beyond our LEED project boundary, so we're referencing CIR #10236, which allows expand
Alternative Compliance in lieu of LEED Tables
NC-2009 IEQp1:Minimum IAQ Performanceposted by kevin connolly on
Has anyone been successful using the alternative compliance path and submitting their own ASHRAE 62.1 calculation/spreadsheets in lieu of using the built in LEED or 62MZCalc form? We would rather
How to deal with a hotel.
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Susan Di Giulio on
Others have asked this before and not gotten an answer so I'm taking another shot. Can someone please verify this approach?
Gym Floor Paints
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Shelley White on
Does anyone know if the graphic arts coating VOC limit of 500 g/L used for Game Line paints is acceptable or do game line paints have to comply with the 150 g/L limit effective 1/1/14?
Checklist states 2 points possible
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Parker williams on
Are you allowed to do both options for this credit? 2 points possible or 1?
Crade to Gate or Cradle to Grave
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Christine Richey on
The company I work for is just in the beginning stages of creating a type III EPD for our engineered wood products.