Forum quick links
CxA contract
CS-2009 EAc3:Enhanced Commissioningposted by Agnieszka Rylska on
Can Commissioning Authority be contracted through the design firm (architects) as part of the LEED certification contract (CxA would be an employee of the LEED consultant company) and not by the ow
Data Centers Modeling Guidelines
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hello, Is there such a thing?, a Guideline to model Data Centers?, where can I found it? Thank you
One model or various separate models
NC-v4 EAp2:Minimum energy performanceposted by Ana Paula Quiros on
Hello! We are working on a hotel, that rather than a single block consists of several blocks connected by walkways and they share the same parking lot. How should we consider the energy model?
Fire Exits, with no exterior handles
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jeff Chapman on
Are these an 'primary or secondary entry'?
PAINTS LOCATION
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by gabriel Morales on
Hello: Our project is a Core&Shell office building registered under LEED C&S v2.0 rating system, pursuing credit IEQc4.2 Low-Emitting Materials: Paints and Coatings, there’s something we a
Success with LCA option?
NC-v4 MRc1:Building life-cycle impact reductionposted by Helene Lefkowitz on
Does anyone know of companies that will perform an LCA for this credit? Also, I'm looking to get in touch with a project team that has successfully met the LCA option for this credit.
dedicated exhaust
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Agnieszka Rylska on
I would like to make sure what does "dedicated/designated exhaust" mean.
Individual Control for Transients- Healthcare Project
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by MURAT DOĞRU on
We have a 650-bed hospital building project registered under LEED v3-Healthcare. Whole building is mechanically ventilated and conditioned.
Unrated filters
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by kathy zarsky on
We are using Mitsubishi fan coil units on a project and provided a description of the permanent filter type in lieu of the MERV rating requested in the table for IEQc3.1.
Renewable energy - EAc1
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
I have modeled a proposed building including PV and solar thermal systems.