Hello, The project is Pharmaceutical Manufacturing facility, where a set of parameters such as Temperature, Humidity &Pressure are to be controlled accurately. We have considered the air conditioning for these areas as process loads and modeled identically in base and proposed case. Now, we are facing unmet hour issue in these areas. Is it required to check and fix unmet for these areas or leave it as such because it is modeled as process loads.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.