Question on Table 6.5.3.1.1B of ASHRAE 90.1-2010 - How is prssure drop of the Air Heat recovery system of the base calculated?

NC-v4 EAc2:Optimize energy performance
posted by  Stephan Zweig  on 

Please give me a feedback if I have calculated right the Fan Power of the baseline building.

3
Tue Feb 18, 2020, 2:53 pm

EDI Resources

SD Leaders
posted by  Douglas Flandro  on 

Here are some EDI resources from our internal discussions about EDI.

3
Sustainability Design Leader, Exhibit Designer, Associate
CambridgeSeven
LEEDuser Premium Member
9 thumbs up
Tue Feb 18, 2020, 2:49 pm

Healthy materials course

SD Leaders
posted by  Kate Bubriski  on 

I am looking at having staff members take a materials course and deciding between Parsons Healthier Materials and AIA Materials Matter certificate programs. Does anyone have feedback on either?

4
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Tue Feb 18, 2020, 12:47 pm
2
Tue Feb 18, 2020, 7:27 am

Opportunity for "Salvage"

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Kath Williams  on 

On many projects, the owners simply think of bringing furniture from previous office to save money.  This pilot credit gave one owner the opportunity to look throughout the corporation and fin

0

seperate control of presentation walls in small rooms

NC-v4 EQc6:Interior lighting
posted by  Benjamin Weise  on 

Hi! There are big medium and small meeting rooms featuring presentation walls. They all have direct lighting from above the tables.

3
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Mon Feb 17, 2020, 6:39 pm

"Local" food production

Pilot-Credits SSpc82:Local food production
posted by  Kath Williams  on 

Although there is great value in the intent of this credit, it is very challenging in cold climates where the rooftops are ideal spots but the weather doesn't allow for an abundance of produce.&nbs

1
Fri Feb 21, 2020, 9:49 pm

Multiple mode

Retail-NC-v4 EQc6:Interior lighting
posted by  Francesco Passerini  on 

In the form in leedonline for Sales areas lighting controls as "Lighting Control Type" the option "Multiple mode" is present. What is the definition of Multiple mode?

Regards

0
6
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Sat Feb 15, 2020, 11:23 pm

Does Hardware need to be included in the Walls category?

NC-v4 EQc2:Low emitting materials
posted by  Renee Shirey  on 

Since hardware (locksets, closers, kickplates) is installed on a door, and a door is part of the Walls category, is hardware required in the Walls category?  I am leaning towards 'Yes", b

3
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Fri Feb 14, 2020, 10:02 pm