Building Space Flushout

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Weld Morse  on 

I am working on a Massachusetts public works maintenance facility. it involves 2 separate structures; an office building and a garage.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Feb 5, 2014, 10:20 pm

New Midrise Rating Selection Guidance

LEED Rating System Selection
posted by  Michelle Rosenberger  on 

Has anyone seen the newest release of the Rating System Selection Guidance (dated 1/27/14 on the download page no date on the document)? It indicates that multifamily residential buildings of 4 to

4
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Wed Feb 5, 2014, 8:06 pm

On-site duct manufacture

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Mauricio Ramirez  on 

Hi. One of the projects in which I'm involved will have on-site HVAC duct manufacture. Does this practice has any inconvenient for the compliance with the credit IEQc3.1?

3
Wed Feb 5, 2014, 5:56 pm

LEED-CS sunset date

General forums
posted by  Tristan Roberts  on 

I believe the standard GBCI policy on sunset dates is six years from the last date that a project could register under the given rating system.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Wed Feb 5, 2014, 4:21 pm

100% OA SYSTEM?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Weidong Luo  on 

an AHU with no return air supplies 100% OA to an office and a conference room with FCUs, the OA supply ducts connected to the FCU supply ducts.

3
Default Avatar
Ecotech International
LEEDuser Basic Member
0 thumbs up
Tue Feb 4, 2014, 8:36 pm

Energy Model documentation and a why is it so...

General forums
posted by  Jesse Robbins  on 

Tristan, Thanks for your offer to get answers. I don't yet have experience in a LEED v4 project, but have been unable to find documentation on using initial vs.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 4, 2014, 7:27 pm

Hexavalent Chromium on groundwater

NC-2009 SSc3:Brownfield Redevelopment
posted by  eirini matsouki  on 

Hi all, Our project is international and is under construction. We are keeping this credit on a stand-by, as during the design submission there was not any evidence of contamination.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 4, 2014, 6:41 pm

Beta Testing

General forums
posted by  Melissa Wrolstad  on 

When will USGBC post the results of the LEED Beta Testing?

7
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Tue Feb 4, 2014, 4:30 pm

MINIMUM IAQ AND FTE

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Paula Hernandez  on 

I have had this doubt from a long time, is the occupancy assumed for IEQ calculations related to FTE?, and if so, in which wa?, Thank you

14
Tue Feb 4, 2014, 2:59 pm

IEQc4.1,c4.2 & c4.2 Add to v2009 to v4 substitutions list

General forums
posted by  Ian McCall  on 

Dear Tristan, I am currently working on European based LEED 2009 (V3) registered projects. Apparently LEED V4 credits IEQ c4.1, IEQ c4.2 & IEQ c4.4 now accept local VOC content regulations as a

6
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Feb 4, 2014, 1:50 pm