CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marcio Alberto Casado Pereira on
Hi all! Can I get any benefit from having green walls in my project, for the purpose of this credit? P.S: It is a Previously Developed Area.
Which type of water needs to be filtered?
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Marcio Alberto Casado Pereira on
Dear all, Please confirm this assumption - our interpretation of this credit is that it only applies to runoff, not to roof captured water. Is this correct?
Health Care - New Construction
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by William Kelly on
For IEQ credit 6.1 Controllability of Systems - Lighting: The requirements for patient areas states "to provide individual lighting controls for 90% (minimum) of patients to enable adjustments to s
Submitting Credits at Very End?
posted by Dave Wortman on
We have a project for which we did a design phase submittal- we are now nearly completion on our construction phase submittal.
IEQ Pr1 - work code in France in place of ASHRAE
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nicolas MOLLE on
Can you confirm me that it is possible, in France, to use the work code to determine the air rate in place of the ASHRAE 62.1-2007 in the places where this local code is more stringent ?
Increasing Space Ventilation Efficiency by Increasing Vpz
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ed Floyd on
Question seems to simple to me but I can not find a definate answer. Is it acceptable / Common to increase the primary air flow to a critical zone to increase the over system ventilation efficienc
The LEED HC vs LEED NC question ....again
posted by Kathy Wislocky on
Our healthcare project will be a licensed facility by the state's deparment of public health. However, it is a community health center and not part of a hospital campus.
Must Performance Period be complete before registering for pc67?
Pilot-Credits EApc67:Energy Jumpstartposted by Reid Middlebrooks on
Is pilot credit 67 only intended for projects that have already completed the EE improvements and can prove a 20% reduction?
Erosion Control
NC-2009 MRc2:Construction Waste Managementposted by Josh Mauldin on
The contractor on my project recently provided me with documentation that ~14 tons of concrete and brick that were removed from the site during demolition were used for erosion control.
Project development stage for submisison
posted by Marcio Alberto Casado Pereira on
Dear all, Our client is insisting to submit the preliminary project for LEED review.