We are currently working on a project in NC (zip 27244). The regional priority threshold for EAp1 Option 1 is supposed to be 28% (new bldgs) and 24% (existing bldgs). However the threshold shown on this link for zip 27244 -
https://www.usgbc.org/RPC/RegionalPriorityCredits.aspx?CMSPageID=2435
shows the thresholds as 30% (new) and 26% (existing).

If this is not a typo when did this change? I have done several searches and have not been able to find any documentation on this change.

Thanks, Donna Juselis