Credit For Excess Chilled Water Rejected To Plant Site Chilled Water SystemNC-v4 EAp2: Minimum Energy Performanceposted by Michael Hill on Feb 14, 2024, 4:53 pm
I am working on a project that is using heat pump chillers to generate hot and cold water for the building systems. When the building loads are cooling dominated, the excess heat is rejected to... Last reply: Abdullah Tahir, Mar 26, 2024, 4:29 am |
|
Dumpster sizes for the recyclables during the construction?CS-v4 MRp1: Storage and Collection of Recyclablesposted by Marine Petrosyan on Jun 29, 2023, 7:43 am
Hi, LEED Users! Can you please help me figure out, whether the dumpster sizes for the recyclables in the construction area should meet any standard under CS-v4 MRp1? I can't find... Last reply: Afogreen Build, Mar 25, 2024, 9:18 pm |
|
Is Zoysia japonica turf?NC-v4 WEp1: Outdoor water use reductionposted by Linh Dang on Dec 23, 2022, 6:17 am
Dear all LEED user expert We use Zoysia japonica for landscape. now we dont know is Zoysia turf or groundcover? if it is turf , how can i approve that is groundcover? Thanks... Last reply: Afogreen Build, Mar 25, 2024, 9:13 pm |
|
Commercial Kitchen QueryCI-v4 EAp2: Minimum Energy Performanceposted by padma priya on Mar 7, 2024, 6:30 am
In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. Last reply: Marcus Sheffer, Mar 25, 2024, 9:48 am |
|
Industrial Process Loads and the Exceptional Calulation MethodNC-2009 EAc1: Optimize Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Apr 16, 2014, 4:22 pm
We have an industrial plant where the process loads are assumed to be, say, 98% of all building energy use. Therefore, even if the non-process building portion was Net Zero Energy, we would not... Last reply: Abdullah Tahir, Mar 25, 2024, 1:39 am |
|
Modeling only conditioned areaNC-v4 EAp2: Minimum Energy Performanceposted by Omar Elrawy on Dec 9, 2020, 10:05 pm
I'm certifying a huge factory with an attached office building. Is it possible to model only the office area? Last reply: Abdullah Tahir, Mar 25, 2024, 1:38 am |
|
Walk off mats for skyway entranceNC-v4 EQc1: Enhanced indoor air quality strategiesposted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm
Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "... Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm |
|
Storage locationNC-v4 MRp1: Storage and Collection of Recyclablesposted by Maiz Rech on Sep 11, 2023, 1:33 pm
Is there a minimum distance or positioning requirement for this area? Would it be a problem to locate the recyclables storage on the building underground floor? Last reply: Thomas Lagarde, Mar 22, 2024, 2:28 pm |
|
Buildings within site but not under LEED scopeNC-v4 EQp2: Environmental tobacco smoke controlposted by Marwa Elzoghby on Mar 22, 2024, 10:44 am
I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope. Given their proximity to the LEED boundary, I am wondering whether it's necessary to... |
|
Building Envelope CommissioningNC-v4 EAc1: Enhanced Commissioningposted by Chris Bennett on Feb 16, 2018, 5:29 pm
Hello All, Has anyone gone through the process of building envelope... Last reply: sooha ham, Mar 21, 2024, 4:09 am |