Forum quick links
Change LEED boundary after Design Review?
NC-2009 PIf2:Project Summary Detailsposted by Joyce Kelly on
LEED boundary encompassing 130 acres was established by Civil to include all stormwater treatment. Following Prelim.
Off-iste reuse: donate recyclable materials to employees who need?
NC-v4 MRc5:Construction and demolition waste managementposted by Thomas Tran on
Dear All,
We attempt for the MRc5 Construction and Demolition Waste Management.
Monitoring for naturally ventilated warehouse
CS-v4 EQp1:Minimum indoor air quality performanceposted by John Smith on
Dear all,
Equipment Manufacturer - How To Navigate Certification Process
posted by Douglas Johnstone on
Good Day.
V4 IAQ ventilation rate
CI-v4 EQp1:Minimum indoor air quality performanceposted by Jerry Young on
I am working on a project using the V4 CI rating stsem. For IAQ ventialtion rate, the standard references and has the calculator for using 62.1 2010 or 2013.
Both Option 1 & Option 2 achievable
NC-v4 LTc3:High priority siteposted by Muge Karasahin on
Hello,
Our project site qualifies both for Option 1. Historic District and Option 2. Priority Designation of the credit. Is it possible to claim two points for this credit?
Eligibility of a warehouse for LEED certification
posted by Michele Di Martino on
Hello everybody!
General Modeling Guidance
CI-v4 EAp2:Minimum energy performanceposted by RDK E&S on
Hi,
We are working on a project that includes 13 floors that spans a 35 story commerical building. I have a few general questions about process:
timing of LEED CS and LEED CI
posted by Courtney Royal on
Can a LEED CI project still achieve certication before the base building achieves the LEED CS certification?