Forum quick links
Default light reflectance values for commodity materials?
NC-v4 EQc6:Interior lightingposted by Joanna Switzer on
Curious if anyone has had success claiming some type of Industry cited / average / worst case LRV for surface finishes such as standard poured in place concrete flooring.
Full Occupancy Calculations
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Giovani Bernal on
Our project is a 24 level office building. At least 75% of occupancy has been reached.
Meters for every floor? One Tenant Building
CI-v4.1 EAc3:Advanced Energy Meteringposted by Susan Di Giulio on
In our CI Project, we have a single Tenant. Per this credit, is a meter required for every floor of this 8 floor building? We believe that is not required for this CI project.
Time to Register for the Sustainable MEP Leaders Summit!
posted by RoseAnn Grimes on
Hello Sustainable MEP Leaders!
Here at BuildingGreen we are excited and looking forward to creating a valuable and engaging online summit with you all for 2020!
Waste Management Subgroup Meeting
posted by Candace Pearson on
Ali Flynn and Alejandra Arce Gomez are planning a breakout meeting for the Waste Managment Group for all interested.
Excluding entrance halls from calculations
Hospitality-NC-v4 EQc7:Daylightposted by Ricardo Sá on
Dear All,
PVC Welding Cement
NC-v4 EQc2:Low emitting materialsposted by Kerry Honsinger on
Anyone come up with a PVC Welding Cement that meets the CDPH Standard Method v1.1 -2010 emissions requirement?
Building height
Pilot-Credits SSpc55:Bird collision deterrenceposted by BELEM SALOMON on
Hi, all the facade materials comply with the threat factor, so no calculation is needed, however I have two questions:
Air purifiers, seperate from HVAC systems
NC-v4.1 INc1:Innovationposted by Jackson Eagle on
Hi all,
Update documentation for previously awarded/anticipated credits
posted by Jorng-ren Chern on
Our project has submitted for the Design Review and some credits have been marked as anticipated.