Forum quick links
Ventless equipment in commercial application question
NC-2009 EAp2:Minimum Energy Performanceposted by Michelle McConnell on
Do ventless dishmachines or ventless cooking equipment provide for leed points? If so, how?
Healthcare V4 - Monitoring outdoor air intake IAQ prerequisite
Healthcare-v4 EQp1:Minimum indoor air quality performanceposted by Alessandro Zuanon on
Hi,
Healthcare rating system, monitoring requirements for prerequisite IAQ:
Outdoor Water Use Reduction - Establishment Period
NC-v4 WEc1:Outdoor water use reductionposted by David Valade on
For Outdoor Water Use Reduction - when targeting 'Option 2: Reduce Irrigation', does LEED v4 or 4.1 allow for an establishment period with potable water or can potable water not be used a
Floor classification
NC-v4.1 EAp2:Minimum Energy Performanceposted by Davide Liviero on
Hello everyone,
Requerimiento horario
Retail-NC-v4 SSc6:Light pollution reductionposted by Jorge Adalberto Bernal Segovia on
Existe algún requerimiento horario para el apagado y encendido de luces exteriores?
Play area excluded from calculations?
NC-v4.1 SSc4:Rainwater Managementposted by Maddie Spinski on
We are building an early childhood education center next to the existing elementary school.
AEDG Calculator Needed When Base Building Systems Weren't Modified or Contributing to Savings?
CI-v4 EAc2:Optimize energy performanceposted by Gera Feigon on
I have a small office fit-out project that is pursuing Option 2 (prescriptive) for Optimize Energy Performance.
C&S or NC: New Building with leased Office Space but occupied 80-90% by one tenant at completion
posted by Jessica Kavanagh on
Core & Shell vs New Construction:
Monthly Call Information
posted by Jennifer Zakrzewski on
Hello everyone!
I'll be using this thread to post call reminders and notes.
To start us off, the next call is this coming Tuesday, March 24th at 1pm Eastern.
Tolerance within the achievement of criterias due to different affectations
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Audrey LEDESERT on
Hi,
I'm working on a project with administration affectation and some commercial surfaces on the groundfloor (surface < 40% of the total project surfaces).