Log in
Forum » Credit Forums
Topic

Kitchen Equipment- threshold for 1pt credit

Schools-NC-v4.1 WEp2: Indoor water use reduction
posted by Jeremy Theodore on Jun 28, 2024, 2:06 pm

We have a school in design achieving 40% to 45% reduction thus 4 to 5 points for Indoor Water Use Reduction per the LEED v4.1 guide.  If it achieves at least 40% (antiicpated) it would then...

Exemplary Performance for CS

CS-v4.1 EAc5: Renewable energy
posted by Sofia Barahona on Jun 27, 2024, 1:40 pm

What it the percentage of...

Last reply: Sofia Barahona, Jun 28, 2024, 1:51 pm

Building Product Disclosure and Optimization required documentation

NC-v4.1 MRc4: Material Ingredients
posted by Marcelo Alencar Pereira on Jun 25, 2024, 2:28 pm

Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online? If we don...

Last reply: Tommy Linstroth, Jun 28, 2024, 9:48 am

Option 2 IAQ Testing

NC-v4 EQc4: Indoor air quality assessment
posted by Robert Cashins on Nov 7, 2022, 12:18 pm

Are there guidelines on how to determine how many air samples need to be collected to comply with the...

Last reply: Bipin Karki, Jun 26, 2024, 4:49 pm

Are all spaces outside the 3x head height excluded?

NC-v4.1 EQc8: Quality Views
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 10, 2024, 9:17 am

I realize this is most likely quite a basic question, but in V4.1 are allowable quality view areas only for those regularly occupied spaces within the 3x head height zone and all others do not...

Last reply: Adam McCaughan, Jun 27, 2024, 12:23 pm

Pressurized entryway vestibules at high-volume building entrances

Healthcare-v4 EQc1: Enhanced indoor air quality strategies
posted by Priscillia Champagne on Feb 1, 2021, 8:26 am

Hi, I would like to know if there is additional guidance on the requirement to provide pressurized entryway vestibules at high-volume building entrances. Is there a standard to follow or specific...

Last reply: Kai Starn, Jun 27, 2024, 12:19 pm

Heat Island Reduction

NC-v4 SSc5: Heat Island Reduction
posted by Jose Castorena on Jun 27, 2024, 11:26 am

In this credit under option 1 the standard formula includes a vegetated roof.  If our client does not wish to pursue this feature due to perceived maintenance, can we still achieve this credit...

Last reply: Deborah Lucking, Jun 27, 2024, 12:05 pm

Flush-out option preferred, but some furniture delivery delayed

NC-v4 EQc4: Indoor air quality assessment
posted by Erica Downs on Aug 15, 2019, 11:58 am

The project contractor intends to do a full flush-out prior to occupancy.  Most of the furniture will be installed prior to flush-out, but on particular oder has been delayed and may not arrive...

Last reply: Russ Pellegrino, Jun 27, 2024, 11:48 am

Has anyone received feedback for Path 1- Develop a Standard Green Lease?

Pilot-Credits EApc159: Green Leases ACP
posted by Kristina K on Apr 21, 2023, 9:48 am
Last reply: Talia Fishman, Jun 26, 2024, 1:54 pm

Permeable Paving- "vegetated open space"

NC-2009 SSc5.2: Site development - maximize open space
posted by Lauren Sparandara on Mar 21, 2011, 3:50 pm

If our permeable paving has grass growing through it could that count as both hardscape for SSc7.1 and for vegetated open space in SSc5.2? We aren't achieving SSc2 so we cannot technically...

Last reply: Maya Facciolo, Jun 25, 2024, 10:13 pm