SSc4.3 as it relates to SSc4.4 Opt 3 "no new parking"

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Jason Biondi  on 

Our project is a new classroom building, on a college campus, whereby no new parking is being built or provided.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 7, 2014, 6:07 pm

Table 1 is compulsory

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

it is required to comply with the table 1 for each fixture as it seems to state in the establisment period for option 1 calculated water use, or it is enough to comply with the baseline 120% o 150%

2
Sustainability Advisor
Transwestern Sustainability Services
LEEDuser Basic Member
12 thumbs up
Tue Oct 7, 2014, 5:43 pm

Indoor water use Reduction Calculator bug

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

There is a bug in the Indoor water use Reduction Calculator when there is no urinals, the male water closet uses per day are set to 4 instead of 3 uses per day. How can we solve this?

4
Sustainability Advisor
Transwestern Sustainability Services
LEEDuser Basic Member
12 thumbs up
Tue Oct 7, 2014, 5:19 pm

VOC Compliant Chemicals - IEQ3.3

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Jessica Wasmuth  on 

I am working on compiling a list of our Green Chemicals used onsite for a LEED certification.

3
Tue Oct 7, 2014, 3:55 pm

Confused about Perf periods and 2-yr contract for offsite REC's

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Wendy Parker, LEED AP  on 

We purchased REC's (Texas products) for backdates 3/13 to 3/14 AND going forward 3/14 to 3/15 to cover both the Perf Period AND the 2 yr contract requirement for the credit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 7, 2014, 1:19 pm

Addition added after documentation has been submitted

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Angela Bickford  on 

I think I know this answer to this, but I can't find an answer anywhere so I would like someone else's opinion. I'm working on a LEED for schools project. About 3/4 of the building was renovated.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 7, 2014, 12:21 pm

Concrete Washout

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Paula Hernandez  on 

Hello everyone, we are working on a project in an estate, part of this estate is the current LEED project, with its own LEED boundary.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Oct 6, 2014, 12:00 pm

Wind renewable energy- Green Powert

NC-2009 EAc6:Green power
posted by  Ramesh Narayanan  on 

One of our client has already own the wind turbine for 100% of the buildings electricity. They want to show that wind turbine power to meet the LEED requirement.

8
Default Avatar
LEED-AP BD+C
Leighton Contractors Philippines Inc.
LEEDuser Premium Member
22 thumbs up
Sat Oct 4, 2014, 9:20 pm

Modeling Heat Reclaim in EAp2 v2009

NC-2009 EAp2:Minimum Energy Performance
posted by  Mario S.  on 

Hello, We are working on a project that uses heat reclaim as a source of energy for service hot water.

4
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Sat Oct 4, 2014, 8:56 pm

Landscaped area included or only irrigated landscape areas?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Kevin Gilleran  on 

Are all landscaped areas within the LEED project boundary included in the calculations for this credit or just irrigated landscaped areas?

2
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Fri Oct 3, 2014, 12:19 pm