Forum quick links
Theater Space
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Adam Rustige on
Hello, I'm working on a Auditorium and classroom addition for a High School. I have to use Option 3 and want to get clarification on the theater space.
Modeling advice
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan M. Kaplan on
We are trying to evaluate the best way of meeting this requirement through Option 1 - Simulation according to the latest (May 2011) Addenda changes (min. 10 fc on Sept.
Changing a Design Credit in Construction
posted by Brianne Smith on
I tried looking through all of the questions on this board for a similar one and didn't see it; hopefully this isn't a repeat.
FSC certified shop
NC-2009 MRc7:Certified Woodposted by Marc Perry on
Does a cabinet fabricator need to be a "FSC certified shop" in order to achieve the MRc7 (Certified Wood) credit?
MR cr2 : Option2
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Remigio Antonio Rancan on
Hi all. I’d like to give the right interpretation about option2.
Basement Ventilation exceptional calculations
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Our project has 4 basements with fresh air, exhaust and circulation fans.
Certified Green-e REC - Calculation for Exemplary Performance
NC-2009 EAc6:Green powerposted by Grace Ming on
Hi all, I would like to clarify the requirement of Green Power to achieve the Exemplary Performance credit.
SSc10 Option 2
Schools-2009 SSc10:Joint Use of Facilitiesposted by Jim Cook on
We have a school project where the district has contracts for use of spaces in the building by outside community organizations.
Wall Tile
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Diana Studer on
I am working on a project in Canada that came back with first review commenting on the VOC content of the tile used.