hotel with cottages
posted by Emmanuel Pauwels on
We are looking at a hotel project (BD&C) that consists of a main building and separate cottages.
Perimeter Controls
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Mesquita on
Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft).
LEED Boundary / Silt Fencing
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Carrie Laurendine on
Currently working on a project that is a large site with an existing building currently on the site.
SS C7.2 High albedo roof area -120%?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Soo young No on
I have just submitted design submittal. When I calculated the High albedo roof area, it came out to 120%. Can I apply for the examplary credit?
EBOM on Core and Shell (not LEED) building
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by LEED Pro Consultant on
We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.
PBE Edifica for EAp2 compliance
CS-2009 EAp2:Minimum Energy Performanceposted by Mauricio Torres on
Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.
Indoor/Outdoor Pool
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Tom Liebel on
We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an outdoo
NC V4: Advanced Energy Metering of Entire Building
NC-v4 EAc3:Advanced energy meteringposted by Erik Gutierrez on
Hello all, I'm looking at metering a new construction building with a single controller.
EAp1-1 Commissioning Report Upload Location Missing
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Sam Stoltze on
The new LEED Online interface seems to be missing the ability to upload a commissioning report.
Submitting New Design Credits During Construction Review
posted by Charlie Haas on
I am working on a project that underwent a split review. We have received and accepted our final design review submission.