Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

wall mounted thermal controller

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Noriko Nagazumi  on 

Hi, Initial design review has just been returned for our project.

2
Fri Mar 6, 2015, 10:07 pm

leed credit EAc4

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Dennis Ross  on 

Having built a cafeteria at a local University we are having trouble getting the Q (tons ) for some of the refrigerated display equipment.

2
Default Avatar
Consultant & Design Services Director
True Mfg
LEEDuser Basic Member
3 thumbs up
Fri Mar 6, 2015, 6:29 am

Precision Air Conditioning for Server Room and Art Gallery

NC-2009 EAp2:Minimum Energy Performance
posted by  Panupant Phapant  on 

Dear All We have two projects that are attempting LEED 2009 NC Certification the first one is office building with server room and the second one is Arg Gallery.

5
Fri Mar 6, 2015, 2:34 am

Component Assembly

NC-2009 MRc5:Regional Materials
posted by  Frank Burkhart  on 

Sorry if this is a rudimentary for all you LEED guru's out there, but I am hoping you can clarify the question I have on a number of items we are specifying for our first LEED project We are speci

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Mar 5, 2015, 10:52 pm

Path 7 and 8 reviewer comments, advice for resubmission

CI-2009 SSc1:Site Selection
posted by  Keelan Kaiser  on 

We had a CI project returned without approval for SSc1 paths 7 and 8. It is a school project, an addition, and the owner did not install any irrigation systems.

3
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Mar 5, 2015, 10:27 pm

Duct Sealant

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Yaneth Galindo  on 

I used a duct sealant with VOC = 49 g/l and I am not sure if it complies with IEQ credit 4.1, because I do not know in which category it falls in the table.

2
Thu Mar 5, 2015, 1:45 am

Warehouse Office

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Saul Pichardo, AIA  on 

My project has a 6,500sf office space serving a 207,000sf warehouse/distribution center (213,500sf total area).

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Mar 5, 2015, 12:05 am

Laboratory 90.1 Modeling

NC-2009 EAc1:Optimize Energy Performance
posted by  Victoria Watson  on 

Hi, I am modeling a laboratory which has a small area of office space for LEED and wanted to check a couple of approaches: 1) The engineers have informed me that the lab has to be a once through sy

7
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Wed Mar 4, 2015, 7:52 pm

How does LEED view buildings designed per UFC?

NC-2009 EAc1:Optimize Energy Performance
posted by  Kevin O'Brien  on 

Can anyone advise how I should go about running the energy model for a building whose supply air & outside air quantities are being driven not by actual load, but by Unified facilities Criteria

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 4, 2015, 6:41 pm

District steam

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

If we convert district steam to hot water for space heating, is there any guideline on the efficiency (of heat exchanger) for baseline model?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 4, 2015, 4:35 pm