Transients vs. Retail?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Kathryn West on
is there a definition for transients versus retail? We have a dining hall and aren't sure how to classify the students who enter the building for meals.
How can I filled the LEED Online form
CS-2009 WEc3:Water Use Reductionposted by Somsak Jidmon on
My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures w
System 8 VAV + PFP boxes
NC-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Dear All, We are modelling a Baseline Building with System 8 “VAV + PFP boxes” using HAP by Carrier. We are wondering how to model the VAV + PFP boxes according to ASHRAE 90.1 Section 3.1.3.14.
Data Center Baseline systems
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.
Dear Sirs,
We are consultants
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maya Karkour on
Dear Sirs, We are consultants for a mall seeking LEED. Most of the spaces will be tenanted.
Reviewr's Comment is requesting labor and delivery
CI-2009 MRc4:Recycled Contentposted by Sarah Thompson on
In all my 40 LEED projects I have never included labor and delivery to a material's cost total.
Min lux level for Project which has registered 5 months before
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by SSN Energy Model on
Hi Every one, Currently we are working for factory building project which has registered five months before under USGBC Rating system LEED 2009.
Pilot Credit 30: No new parking
Pilot-Credits PC30:Alternative Transportationposted by Jon Holway on
Where as multi-family apartment buildings need zoning required parking, as designers of senior independent living facilities, we have found that most municipalities will modify there zoning require
Eligibility for LEED - existing building structure
posted by Agnieszka Rylska on
Our client would like to certify a building that had its structural components and facade built a few years ago.
Dry-Fog coatings
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Lawrence Lile on
I am starting to see a specification for 3. Dry-Fog Coatings: VOC not more than 400 g/L. in MasterSpec and some projects' LEED specs.