Baseline System Type for Hotels
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
Hi, I am wondering what Baseline System Type should be used for hotels?
Fundamental Commissioning Rainwater Harvesting System...
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rick Alfandre on
Our current project will have a rainwater containment system that will be connected to our domestic water supply to provide water for toilet flushing and irrigation.
Separate MEP CxA and BECxA
NC-v4 EAc1:Enhanced commissioningposted by Annalise Reichert on
I am working on a project that is pursuing both Monitoring-based Commissioning and Building Envelope Commissioning.
Consistent SF throughout project
CI-2009 EAp2:Minimum Energy Performanceposted by Stacey Olson on
I've recieved comments on a past project that said all square footages must be consistent throughout the project - so the SF documented in MPR 2 must be the same as EAp2 and WEp1. I'm working on a
Typo in DES v2?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
To calculate the virtual rate, DES v2 option 1 2.4.2.1 gives the equation of $/MBTU of hot water = 1.59*$/MBTU fuel + 3 * $/kWh electricity. This would gives me a really big number.
ASHRAE 90.1-2007: 6.4.3.4.2 building height exemption
CI-2009 EAp2:Minimum Energy Performanceposted by André Harms on
The client of an commercial interiors project location wants to avoid the use of motorized dampers where possible.
Meeting 20% with no Operational Activity
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Michelle Rosenberger on
What do I do with the snow and ice removal activity during the performance period if we don't get any snow? It appears the requirement is 20% compliance in each operational area.
Wood wallbase
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Devani PERERA on
Has anyone seen a floorscore for wood wall base? We have awood wallbase that is manufactured by the millwork contractor.
Transitional Entry Atrium Lobby belong in Energy Model?
NC-2009 EAp2:Minimum Energy Performanceposted by Joyce Kelly on
A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use.
Option 3
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Mike D on
For option 3, do measurements have to be taken more than once?