Baseline System Type for Hotels

NC-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

Hi, I am wondering what Baseline System Type should be used for hotels?

3
Default Avatar
environmental consultant
Bengt Dahlgren AB
LEEDuser Basic Member
1 thumbs up
Wed Apr 15, 2015, 2:59 pm

Fundamental Commissioning Rainwater Harvesting System...

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Rick Alfandre  on 

Our current project will have a rainwater containment system that will be connected to our domestic water supply to provide water for toilet flushing and irrigation.

3
Wed Apr 15, 2015, 2:26 am

Separate MEP CxA and BECxA

NC-v4 EAc1:Enhanced commissioning
posted by  Annalise Reichert  on 

I am working on a project that is pursuing both Monitoring-based Commissioning and Building Envelope Commissioning.

3
Wed Apr 15, 2015, 2:22 am

Consistent SF throughout project

CI-2009 EAp2:Minimum Energy Performance
posted by  Stacey Olson  on 

I've recieved comments on a past project that said all square footages must be consistent throughout the project - so the SF documented in MPR 2 must be the same as EAp2 and WEp1. I'm working on a

3
Tue Apr 14, 2015, 7:20 pm

Typo in DES v2?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

To calculate the virtual rate, DES v2 option 1 2.4.2.1 gives the equation of $/MBTU of hot water = 1.59*$/MBTU fuel + 3 * $/kWh electricity. This would gives me a really big number.

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue Apr 14, 2015, 5:53 pm

ASHRAE 90.1-2007: 6.4.3.4.2 building height exemption

CI-2009 EAp2:Minimum Energy Performance
posted by  André Harms  on 

The client of an commercial interiors project location wants to avoid the use of motorized dampers where possible.

2
Ecolution Consulting
LEEDuser Basic Member
1 thumbs up
Tue Apr 14, 2015, 2:53 pm

Meeting 20% with no Operational Activity

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Michelle Rosenberger  on 

What do I do with the snow and ice removal activity during the performance period if we don't get any snow? It appears the requirement is 20% compliance in each operational area.

4
Tue Apr 14, 2015, 2:46 pm

Wood wallbase

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Devani PERERA  on 

Has anyone seen a floorscore for wood wall base? We have awood wallbase that is manufactured by the millwork contractor.

3
Default Avatar
Green Building Consultant
Elan
LEEDuser Basic Member
15 thumbs up
Tue Apr 14, 2015, 2:37 pm

Transitional Entry Atrium Lobby belong in Energy Model?

NC-2009 EAp2:Minimum Energy Performance
posted by  Joyce Kelly  on 

A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 14, 2015, 4:55 am

Option 3

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Mike D  on 

For option 3, do measurements have to be taken more than once?

3
Default Avatar
LEEDuser Basic Member
45 thumbs up
Mon Apr 13, 2015, 3:02 pm