Topic | Recent |
---|---|
BAS- Lighitng Control for Hotel SpacesEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Ashu Gupta on Jul 13, 2010, 6:12 am
Is it necessary to integrate the entire lighting to BMS such as Hotel lobby lighting, corridor lighting which is always ON (24*7)? Also should guest rooms lighting integrate to BMS or not... Last reply: Pierce Holstrom, Jul 21, 2010, 6:17 pm |
|
Renewable Energy to improve EfficiencyEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Heidi Creighton on Jun 17, 2010, 12:19 pm
If I have a PV system to offset the building energy use can I use it to show performance over 19% to meet the prerequisite (like in NC) or does the building efficiency stand alone to show 19%... Last reply: Jenny Carney, Jul 21, 2010, 2:45 pm |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by kelvin duen on Jul 20, 2010, 3:13 pm
I'm having a little confusion as to what "... Last reply: Paul Conrad, Jul 20, 2010, 3:44 pm |
|
Process Load-Can I call my computer room units a process load?NC-2009 EAc1: Optimize Energy Performanceposted by John Harrington on Jul 16, 2010, 1:45 pm
I have a Liebert Computer Room Unit (DX System) it has a capacity of 137.8 MBH. It has a low efficiency (8.2 EER), the min efficiency listed on the 90/1-2007 TABLE 6.8.1B is 10.6 EER.... Last reply: Christopher Schaffner, Jul 19, 2010, 8:50 pm |
|
TENANT SPACE ENERGY MODELINGCS-2009 EAc1: Optimize Energy Performanceposted by javier bolanos zeledon on Jun 29, 2010, 11:19 am
I'm modeling a CS office building, but have no tenants yet. It is my understanding that I have to provide tenant HVAC equipment as per baseline building requirements to the design building, in... Last reply: Christopher Schaffner, Jul 19, 2010, 8:45 pm |
|
ASHRAE- LPD limitsNC-2009 EAp2: Minimum Energy Performanceposted by Rosana Correa on Jul 16, 2010, 4:29 pm
In one of our projects, we have closed large areas with ceiling height of 95 ft. It is very difficult to illuminate these environments properly according to the boundaries of ASHRAE. The... Last reply: Christopher Schaffner, Jul 19, 2010, 8:40 pm |
|
Providing Bike Lanes for SchoolsSchools-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Maya Karkour on Jul 13, 2010, 11:04 am
Hi all, We are working on a school where the bike racks will be installed in the first basement level just next to the ramp. That same ramp will be very close to the site entrance.... Last reply: Tristan Roberts, Jul 19, 2010, 6:22 pm |
|
Fee for pre-certyfing a buildingCS-2009 IDc2: LEED Accredited Professionalposted by javier bolanos zeledon on Jul 14, 2010, 2:08 pmTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up July 19, 2010- 3:20 pm That really depends.... how big and complex is the building, what are the prevailing rates in your area, etc.I suspect that it will be tough to get an answer to this question in an open forum like this—people are discreet about sharing this info. Log in or register to post comments David Posada Integrated Design & LEED Specialist SERA Architects LEEDuser Expert 1980 thumbs up July 19, 2010- 4:56 pm I agree, there are many variables that affect fee and many professional and legal... Last reply: javier bolanos zeledon, Jul 19, 2010, 5:08 pm |
|
setting coefficients for baseline caseEBOM-2009 WEc3: Water Efficient Landscapingposted by Kevin Kelly on Jul 15, 2010, 12:02 pm
Is drip irrigation considered a conventional practice for rooftop gardens? Is turf grass considered a typical landscaping practice in the northeast? Last reply: Dan Ackerstein, Jul 19, 2010, 4:56 pm |
|
EBOM 2009: Performance period possible before registration?EBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Kelly Knauss on Jul 13, 2010, 12:59 pm
It's not clear to me if energy consumption data collected for EA credit 1 (energy performance) needs to be from the period after registering an... Last reply: Tristan Roberts, Jul 19, 2010, 4:53 pm |