Forum quick links
Title 24
NC-2009 EAp2:Minimum Energy Performanceposted by Gaston Viau on
Hi there My building has full T24 certification. I take it this will be satisfactory to achieve this Prereq? Thanks
post on older LEED for Healthcare forum
Healthcare-v2009 SSc4.1:Alternative transportation - public transportation accessposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this SSc4.1 question was posted. I am reposting the Q&A here for convenience:
fuel source
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Matthew VanSweden on
Our project is a three story Professional Office Building addition to an adjacent hospital.
Factory Area Classification
NC-2009 IEQc2:Increased Ventilationposted by SAMY Chamy on
We have Projects in Bangladesh 1.It have sewing area, Workspaces in which category we classify it (Ashrae 62.1) 1.Sewing Area 2.Cutting Area 3.Inspection area i need to know what is space type i
KCMA -Reston, VA
NC-2009 MRc7:Certified Woodposted by Lilian Seow on
Does anyone have any comments on this KCMA ? Are they considered as USGBC approved equivalent for LEED V4? http://www.kcma.org/ http://greencabinetsource.org/
Street frontage and an urban setting
Pilot-Credits PC14:Walkable Streetsposted by Renee Shirey on
Has anybody had success with this credit on a project in an urban setting? What about approaching it with an 'Alternative Compliance" path?
Existing Central Plant and New building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
We have a new building that is served by the existing central plant.
Calculations
NC-v4 SSc4:Rainwater managementposted by Gustavo De las Heras Izquierdo on
Hallo, I have documented SSc6.1 and SSc6.2 for almost 15 projects with a 100% success rate.
LEED Baundary Campus - parking lot
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by gabriel Morales on
We have a campus project consists of 2 towers with retail corporate considered LEED CS and 2 residential towers that are not LEED certified , is underground parking on 5 levels with a design criter
Appeal Design Credits After Construction Review has begun?
posted by Garrett Ferguson on
I have a CS 2009 project where 2 credits were denied in the Design Final Review. We are sitting at 42 points if all goes as planned.