FTE in a healthcare outpatient facility
NC-2009 PIf3:Occupant and Usage Dataposted by Elise LaPaglia on
I am working on a LEED-NC project that is primarily an outpatient facility but has some future shell spaces for Retail and some for future expansion of the outpatient facilities.
Pilot credits
EBOM-v4 INc1:Innovationposted by Charalampos Giannikopoulos on
Is there any particular reason for which a Pilot credit from the general EBOM rating system such as the "Design for active occupants" credit would not be accepted for LEED v4 O+M - Data Centers?
EnergyPro for Whole Building Energy Simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Logan Dorrell on
We have a project in which they are attempting to use EnergyPro to show compliance for credits EAp2 and EAc1.
Can FSC Product Certification replace invoices?
CI-2009 MRc7:Certified Woodposted by Mauricio Ramirez on
Hello. I'm pursuing this credit on a project in Mexico City.
To what extent we provide Tenant fitout
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Indochine Engineering VN on
Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.
How to document a non-LEED-certifiable building?
NC-2009 EAp2:Minimum Energy Performanceposted by Anya Fiechtl on
Our project includes a separate non-LEED certifiable building with no regularly occupied space and no FTE, that houses the renewable energy and ground source heat pump systems for the main building
Naturally ventilated open cafeteria
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Magda Aghababyan on
Dear all, We have a fully naturally ventilated open cafeteria (No walls, only roof mounted on top of columns) that is occupied only for max about 2 hrs a day during 1hr lunch break and two tea bre
Separate CxA's for Fundamental and Enhanced Cx?
NC-2009 EAc3:Enhanced Commissioningposted by Timothy Casper on
In a traditional design-bid-build project, does the CxA need to be responsible for both fundamental and enhanced Cx? Or can these credits be split between two CxA's?
Coffee Shop
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathryn West on
Gosh, this credit is never 100% in the "yes" column when you have a building that is not a traditional office space. I have a coffee shop in my building.
building is eligible or not
CS-2009 IEQc7:Thermal Comfort—Designposted by Ron Dean on
I am bit confused about the requirements of the Thermal comfort-desing’ credit for C&S Can you please help me on figure out if my building is eligible or not. The building is mechanical ventil