Forum quick links
Transit Service Tables
ND-v2009 PIf3:Project Location and Base Mappingposted by Michael Smithing on
Where can I find the Transit Service Tables that are referred to on the form?
Ventilation for parking garage
NC-2009 IEQp1:Minimum IAQ Performanceposted by FABIO VIERO on
Hi All, I have a question about a project under LEED certification. We are designing the ventilation of one floor below-grade parking garage, situated below an open area adjacent to an office bui
LEED-NC or LEED for Homes (and v3 vs v4)?
posted by emily reese moody on
Hello, I've tried calling USGBC, who told me to email certinfo@usgbc.org. I did that a little over 2 weeks ago, and have yet to get a response.
Combining Option 1 and Option 2
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lyle Axelarris on
Has anyone had any experience combining the approaches in Option 1 and Option 2 to achieve this credit? We plan to use economizer cooling for most of our cooling needs.
How does the formula work with mixed new and existing projects?
CS-2009 EAc1:Optimize Energy Performanceposted by Charles Nepps on
Our project building is 75% existing and 25% new construction. When the credit form calculates the EAc1 points, it is done based on a weighted average, which makes sense.
Lease Language Mandate for Fixture Flow Rate Thresholds
CS-2009 WEc3:Water Use Reductionposted by Jay Murray on
Similar to Diego's comment, we actually have two buildings where we are installing the plumbing infrastructure as part of the Core and Shell scope, but not the acxtual fixtures.
calculator v06
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by M. Galvao on
Hi, I'm using for the first time the "water use reduction calculator v06" and I have a question about the table "flush fixtures". When I have a toilet male, a toilet female and a urinal, what is t
DES for a combination of rated and non-rated building
NC-2009 EAp2:Minimum Energy Performanceposted by Bradley Felts on
I have a project that will be conditioned by a water-cooled chiller and boiler plant located in one of the building that will be rated.
LEED CS 2009 EAc1
CS-2009 EAc1:Optimize Energy Performanceposted by Ruel Galve on
We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design power from A
Baseline ventilation rates
NC-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
When the project is pursuing the increase ventilation which ventilation rates have to be used for the baseline 62.1 or 62.1 + 30%? I am working in LEED V2009. ASHRAE 90.1-2007