Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Transit Service Tables

ND-v2009 PIf3:Project Location and Base Mapping
posted by  Michael Smithing  on 

Where can I find the Transit Service Tables that are referred to on the form?

4
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Tue Sep 1, 2015, 2:00 am

Ventilation for parking garage

NC-2009 IEQp1:Minimum IAQ Performance
posted by  FABIO VIERO  on 

Hi All, I have a question about a project under LEED certification. We are designing the ventilation of one floor below-grade parking garage, situated below an open area adjacent to an office bui

2
Mon Aug 31, 2015, 2:02 pm

LEED-NC or LEED for Homes (and v3 vs v4)?

LEED Rating System Selection
posted by  emily reese moody  on 

Hello, I've tried calling USGBC, who told me to email certinfo@usgbc.org. I did that a little over 2 weeks ago, and have yet to get a response.

6
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Aug 31, 2015, 1:39 pm

Combining Option 1 and Option 2

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Lyle Axelarris  on 

Has anyone had any experience combining the approaches in Option 1 and Option 2 to achieve this credit? We plan to use economizer cooling for most of our cooling needs.

7
LEED Services Director
Group14 Engineering, Inc.
LEEDuser Premium Member
47 thumbs up
Sat Aug 29, 2015, 1:50 am

How does the formula work with mixed new and existing projects?

CS-2009 EAc1:Optimize Energy Performance
posted by  Charles Nepps  on 

Our project building is 75% existing and 25% new construction. When the credit form calculates the EAc1 points, it is done based on a weighted average, which makes sense.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Aug 28, 2015, 3:36 pm

Lease Language Mandate for Fixture Flow Rate Thresholds

CS-2009 WEc3:Water Use Reduction
posted by  Jay Murray  on 

Similar to Diego's comment, we actually have two buildings where we are installing the plumbing infrastructure as part of the Core and Shell scope, but not the acxtual fixtures.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Aug 28, 2015, 11:05 am

calculator v06

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  M. Galvao  on 

Hi, I'm using for the first time the "water use reduction calculator v06" and I have a question about the table "flush fixtures". When I have a toilet male, a toilet female and a urinal, what is t

2
Sustainability Analyst
ETC Group
LEEDuser Basic Member
8 thumbs up
Thu Aug 27, 2015, 6:16 pm

DES for a combination of rated and non-rated building

NC-2009 EAp2:Minimum Energy Performance
posted by  Bradley Felts  on 

I have a project that will be conditioned by a water-cooled chiller and boiler plant located in one of the building that will be rated.

5
Default Avatar
Atlantec Engineers
LEEDuser Basic Member
0 thumbs up
Wed Aug 26, 2015, 7:44 pm

LEED CS 2009 EAc1

CS-2009 EAc1:Optimize Energy Performance
posted by  Ruel Galve  on 

We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design power from A

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 26, 2015, 2:04 am

Baseline ventilation rates

NC-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

When the project is pursuing the increase ventilation which ventilation rates have to be used for the baseline 62.1 or 62.1 + 30%? I am working in LEED V2009. ASHRAE 90.1-2007

3
Default Avatar
PROJECT MANAGER
SOLUCIONES ENERGETICAS SOSTENIBLES
LEEDuser Basic Member
7 thumbs up
Tue Aug 25, 2015, 5:26 pm