Hello Marcus!

In the HVAC design of a project, there is a space where supply ventilation is included in order to accomplish the minimum amount of air required by ASHRAE 62.1-2007 standard. However, no cooling or heating system exists. Can we consider this space as ventilated only? or Do we have to simulate it as conditioned?

Thanks in advance.