Economizer High-Limit Shutoff for Massachusetts

NC-2009 EAp2:Minimum Energy Performance
posted by  Ritwik Kakati  on 

We are working on a project in Massachusetts, and I wanted to clarify what the Economizer High-Limit Shutoff requirement for Baseline case. All of Massachusetts is listed as Climate Zone 5.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Dec 4, 2015, 12:08 am

Unrenovated space HVAC system and lighting unknown

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have a renovation project where the unrenovated space HVAC and lighting power are unknown.

2
Sustainability Professional
Bright Green
LEEDuser Basic Member
31 thumbs up
Thu Dec 3, 2015, 9:56 pm

the coffee pot and the refrigerator

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Michele Helou  on 

After hours of struggling with the absurdity of this credit on a project with a handful of new appliances and equipment - some that run continuously, some that don't, I decided to walk around the

5
Thu Dec 3, 2015, 7:29 pm

Renovation and New Construction

NC-2009 EAp2:Minimum Energy Performance
posted by  CT G  on 

Hi all, we are working in a project with 61.8% of the floor area for renovation and 38.1% is new construction.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 3, 2015, 4:51 pm

Lighting control in bedrooms

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jyothsna Giridhar  on 

As per the IEQ Space matrix released in October 2013, bedrooms are described as individual work stations.

6
Mechanical Engineer
Luckett & Farley
LEEDuser Basic Member
4 thumbs up
Thu Dec 3, 2015, 3:28 pm

definition of work room

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Kathryn West  on 

The IEQ Space Type Matrix says work rooms in libraries are multi-occupant spaces. What is the definition of a work room? A meeting room with a big table?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Dec 3, 2015, 3:16 pm

Qualifying VRF Systems

CS-2009 EAc4:Enhanced Refrigerant Management
posted by  Kristopher Lashley  on 

We are working on a retail project and the mechanical designer insists on using a split VRF system.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Dec 2, 2015, 11:37 pm

Residential - SSc 4.4 Requirements

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Jason Biondi  on 

For a residential project not exceeding local zoning requirements for parking capacity, which of the following strategy needs to be implemented to successfully earn SSc 4.4 (1) Provide a carpool r

3
Managing Director
Energy Cost Solutions Group
LEEDuser Premium Member
13 thumbs up
Wed Dec 2, 2015, 11:22 pm

How to "meter" fuel deliveries?

Schools-NC-v4 EAp3:Building-level energy metering
posted by  Keith Robertson  on 

The prerequisite requires energy metering. What needs to be done to meet the requirement for this for fuels that are on a delivery-basis, such as biomass, propane, and fuel oil?

3
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Wed Dec 2, 2015, 5:57 pm

Core Performance Guide

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Ciaran McCabe  on 

Hi, Can somebody please send me the link to where I can get the "New Building Institute Advanced Buildings Core Performance Guide applicable for LEED CI 2009. Thanks.

6
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Wed Dec 2, 2015, 2:27 pm